Follow the water through a 1,000 m² pilot

Original labelled teaching drawing · use the numbered explanation alongside it

1 Refuge

10 × 10 m

100 m²

1 m mean

50 m (10 m intervals)

2 Rice area: 900 m²

20 m

3 Duck night shelter

On dry land, outside field

4 Managed

settling /

holding zone

5 Approved

irrigation

reuse

Screened inlet

Gated fish access

Plan footprint drawn at consistent scale. Bund width, bank slopes and the outlet must be added to a site-specific design.

Total study area 1,000 m² · 10% refuge · 90% rice

Use a 20 × 50 m rectangle only as a planning example: total area 1,000 m², of which 100 m² is a fish refuge and 900 m² a rice plot. FAO’s primer describes a refuge commonly around 10% of a rice field. The example adopts that proportion; it does not assert that a 10 × 10 m pond is suitable for every soil, slope or rainfall.

A measured pilot: field, refuge, ducks and irrigation (continued)

1. Survey before excavation Walk the proposed boundaries after rain. Locate utilities, flood routes, existing wetlands, neighbouring water use and access for maintenance. Take soil and water samples. Get local advice on the soil’s ability to retain water and on bank stability.

2. Separate inlet and outlet Provide a clean, controllable inlet and a screened outlet. Make screens removable for cleaning. Put a marked water-level staff where it can be read from the path. Overflow must have a safe, permitted destination.

3. Keep the duck shelter on land Provide a dry, predator-resistant night shelter, feed storage, clean drinking provision and a route for removing bedding. A structure over water is not required for the principle to work.

4. Keep irrigation under control A holding or planted treatment area may settle solids and take up nutrients, but is not automatically a pathogen-removal process. Reuse water only for an approved use following its quality assessment. Keep raw-eaten crops and their washing water out of the manure loop.

Turn the plan into a materials request

Number the inlet, outlet, connecting gate, water-level staff and night shelter on the site plan. The example begins with two removable screens and four boundary pegs. Pipe length, diameter, valve rating and spillway materials remain blank until the surveyed route and hydraulic design define them. Measure each route on site; do not order pipe by measuring this printed diagram.

Prepare two clean sampling containers and waterproof labels before commissioning. Label samples by source and time, so an inlet result cannot be mistaken for a fish-refuge result. Keep a separate container for feed; a bucket that has held chemicals or dirty water does not become a clean food tool merely because it looks empty.

Units and terms in this account

kg kilogram, a mass unit · % percent, parts per hundred · m² square metre, an area unit · m metre, a length unit · × multiplied by

m² square metre, an area unit · % percent, parts per hundred · FAO Food and Agriculture Organization of the United Nations · m metre, a length unit · × multiplied by

m² square metre, an area unit · m metre, a length unit · m³ cubic metre, a volume unit · = equals · × multiplied by · L litre, a volume unit · mm millimetre, 0.001 metre