1. Survey before excavation Walk the proposed boundaries after rain. Locate utilities, flood routes, existing wetlands, neighbouring water use and access for maintenance. Take soil and water samples. Get local advice on the soil’s ability to retain water and on bank stability.

2. Separate inlet and outlet Provide a clean, controllable inlet and a screened outlet. Make screens removable for cleaning. Put a marked water-level staff where it can be read from the path. Overflow must have a safe, permitted destination.

3. Keep the duck shelter on land Provide a dry, predator-resistant night shelter, feed storage, clean drinking provision and a route for removing bedding. A structure over water is not required for the principle to work.

4. Keep irrigation under control A holding or planted treatment area may settle solids and take up nutrients, but is not automatically a pathogen-removal process. Reuse water only for an approved use following its quality assessment. Keep raw-eaten crops and their washing water out of the manure loop.

Turn the plan into a materials request

Number the inlet, outlet, connecting gate, water-level staff and night shelter on the site plan. The example begins with two removable screens and four boundary pegs. Pipe length, diameter, valve rating and spillway materials remain blank until the surveyed route and hydraulic design define them. Measure each route on site; do not order pipe by measuring this printed diagram.

Prepare two clean sampling containers and waterproof labels before commissioning. Label samples by source and time, so an inlet result cannot be mistaken for a fish-refuge result. Keep a separate container for feed; a bucket that has held chemicals or dirty water does not become a clean food tool merely because it looks empty.

A section explains what the plan cannot

1 Rice root zone sits in soil.

2 Shallow field water is regulated.

3 The refuge retains a deeper water volume.

Read the illustration’s labels

Deeper water

holds fish as

the field drains

1

2

3

Example storage: 900 m² × 0.10 m + 100 m² × 1.0 m = 190 m³.

Depths are calculation assumptions; effective volume depends on slope and sediment.

A plan tells you where things are. A section tells you what happens when the water level falls. The refuge remains connected while the crop field is wet and retains water when the field is drained. Gates and screens must permit management without releasing stocked fish into natural waterways.

Size the water store and read a section

Calculation Worked example Meaning

Rice field storage 900 m² × 0.10 m = 90 m³ Shallow field water, before plant displacement and unevenness.

Refuge storage 100 m² × 1.0 m = 100 m³ Uses mean depth, not the deepest point.

Combined example 190 m³ = 190,000 L Initial volume, not annual demand.

Daily loss scenario 1,000 m² × 0.006 m = 6 m³/day An assumed 6 mm loss; measure local evaporation and seepage.

14 dry days 6 × 14 = 84 m³ Replenishment allowance before rainfall or other flows.

Do not use these vertical sides as an excavation drawing. Real bank slopes, freeboard, erosion control and spillway capacity change both the footprint and storage. Survey cross-sections and calculate volume from those sections before ordering work. The 190 m³ illustration exists so a reader can audit units; a contractor needs an actual design.

Start with water alone. Fill, mark level and record change under known weather conditions. Inspect leaks and overflow behaviour before introducing animals. A system that cannot hold or safely release water is not ready to be stocked.

Units and terms in this account

m² square metre, an area unit · % percent, parts per hundred · FAO Food and Agriculture Organization of the United Nations · m metre, a length unit · × multiplied by

m² square metre, an area unit · m metre, a length unit · m³ cubic metre, a volume unit · = equals · × multiplied by · L litre, a volume unit · mm millimetre, 0.001 metre

m³ cubic metre, a volume unit