A resting island and a separate secure shelter
Original labelled teaching drawing · use the numbered explanation alongside it
3 Secure night house
Dry bedding + ventilation
Predator-resistant closure
Return before night
3 m dry platform
1 Optional dry island: 3 × 2 m in this study. Actual banks need a site design. 2 Gentle duck access; no unverified human bridge or floating load rating. 3 Island ≠ predator-proof shelter. Count birds back into the shore house.
The optional sketch adds a 3 × 2 m dry island inside a conceptual pond. It gives the ducks a resting place and a visible return point. It does not make them predator-proof: swimming mammals, climbing animals and aerial predators can still reach birds. Night protection comes from a properly built, ventilated, locked shelter and its protected enclosure.
1. Include the island in the earthworks design Have the designer specify stable soil, slopes, freeboard above the operating water level, drainage and erosion protection. A mound placed without checking settlement can become a submerged muddy patch.
An island is a daytime refuge; the secure night house is ashore (continued)
2. Provide duck access and human maintenance access Use gently accessible banks or a suitable non-slip animal ramp. Plan a safe way to inspect and maintain the island. Do not imply that an improvised plank is a rated human bridge.
3. Teach a return routine Feed and close the flock in the shore house at a consistent time. Practise the routine before unrestricted access. Count birds in and out; a missing bird needs investigation, not an assumed return later.
4. Retain overhead and perimeter protection where required Design the secure run for local predators and bird-health rules. Netting must not entangle wildlife. Protect feed from rodents and exclude wild waterfowl contact as the local biosecurity plan requires.
Area correction: if a 6 m² island replaces water within the original 100 m² refuge, open water becomes 94 m². At the same assumed 1 m mean depth, the example storage falls from 190 to 184 m³. Alternatively enlarge the refuge footprint to retain 100 m² of open water, then redesign the field boundary. Never leave the old volume in the budget after changing the drawing.
Island-related equipment allowance; excavation and shelter excluded
Item / quantity ARS USD equivalent EUR equivalent
Animal ramp materials allowance 90,000 57.32 50.85
Secure shelter locks and mesh allowance 160,000 101.91 90.40
Water-level and island survey markers 15,000 9.55 8.47
Subtotal 265,000 168.79 149.72
Units and terms in this account
FAO Food and Agriculture Organization of the United Nations · × multiplied by · m metre, a length unit
m metre, a length unit · × multiplied by · m² square metre, an area unit · m³ cubic metre, a volume unit · ARS Argentine peso · USD United States dollar · EUR Euro