A second machine adds resilience only to the failures it can actually bypass. The diagram traces an electrical supply and a water-delivery path. Either pump is assumed to be capable of the intended flow, but both pumps still depend on a shared panel and a common delivery line. That arrangement can cover an individual pump failure while leaving other interruptions unresolved.

Read the illustration’s labels

TWO SOURCES

Utility / generator

ONE SHARED PANEL

Failure here affects both

PUMP A

PUMP B

COMMON DELIVERY LINE

Gold identifies the electrical dependency and blue identifies the water path. These colours describe this diagram. The pump branches rejoin the same delivery line, so a blockage or failure on that shared line affects both. A shared control, power panel or source can similarly interrupt both branches. The drawing establishes relationships, not equipment ratings or wiring instructions.

FEMA, the United States Federal Emergency Management Agency, describes this problem in its emergency-power guidance. Redundant equipment may be defeated by a common failure, including normal and emergency switchgear exposed to the same fire or flood. Trace controls, distribution and environmental exposure as well as the machines themselves. [RD-I-SPA-D407, Appendix B]

Keep service records with the equipment

For each essential service, retain its equipment identities, operating instructions, responsible maintainer, maintenance history and the dependencies that must remain available. Record what a backup was actually checked to supply, under which conditions, and which shared components remain. Installation or transfer arrangements require the responsible qualified designer and the applicable site requirements; the relationship diagram supplies neither a wiring design nor a capacity certificate.

A store record reconciles quantities and responsibility

Original teaching drawing; numbered parts correspond to the written method

Opening 96 L − issued 18 L + received 24 L

Expected balance at handover: 102 L

Fresh count: 17 containers × 6 L = 102 L

Read the illustration’s labels

Opening

96 L

Issued

18 L

Remaining

102 L

Held stock stays outside the accepted-stock total.

Write the issue, recipient, date and balance before handing over.

At 11:00 the successor needs a reconciled quantity and the records that explain it. Accepted receipts add to stock; issues subtract. An order on its way is still a request, not water available in the store.

Time / eventChangeAccepted balance
09:00 opening count16 × 6 L96 L
09:35 issued to named recipients−18 L78 L
10:20 accepted receipt+24 L102 L
11:00 fresh physical count17 × 6 L102 L

1. Count by container.

Check identifiers, seals, accepted status and the actual quantity. Nominal 6 L containers are inputs in this invented example, not proof of water quality or exact filled volume.

2. Keep held stock separate.

Four held containers stay outside the accepted balance. Another 12 L requested but not received remains pending. Report each status explicitly.

3. Pass the discrepancy forward honestly.

If the fresh count differs from 102 L, preserve both figures, investigate and add a dated correction with a named author. Never alter an old issue silently to force a match.

Units and terms in this account

L litre, a volume unit · = equals · × multiplied by

L litre, a volume unit · × multiplied by