DECISION LOG: date and time; observed conditions; source of information; stay or leave decision; destination if leaving; person informed; next trigger or review time.
Printable household and neighbour records
Practical method and reference
Origin and practical purpose
Household records reduce memory errors and improve continuity, but collecting more personal information is not always helpful. Record what serves an agreed purpose, with consent, and keep it accessible to the people who need it.
Five applications
1. Contact continuity: retain a paper copy when devices fail.
2. Care handover: communicate essential arrangements.
3. Supply accounting: reconcile stock movements.
4. Neighbour assistance: coordinate voluntary help.
5. Recovery records: preserve dates, repairs and receipts.
2. Ask the people involved what they consent to share.
3. Choose the minimum fields needed for the purpose.
4. Verify contact details directly rather than copying an old list.
5. Give each record a date and an identified keeper.
6. Store a usable offline copy where authorised household members can find it.
7. Keep sensitive care details separate from widely shared contact lists.
9. Correct outdated entries and withdraw obsolete copies where practical.
10. Review after changes in residence, health, consent or contact arrangements.
Ten-step method
1. State the purpose of each record before collecting information.
Worked example and measurements
Practical method and reference · continued
A neighbour assistance entry can contain name, preferred contact, agreed help, limitations and last confirmation date. It need not disclose spare-key locations, valuables, medical diagnoses or periods when a house is empty. Keep a simple revision number so helpers can recognise the current sheet without comparing every line.
Limits and failure checks
Consent to help is not a promise of unlimited availability. Do not publish a neighbourhood contact list without the people's agreement.
837 Reference library
Vi · the complete bug‐in guide
Inspect the water path at five points
A visual reading of the existing method and its evidence.
See the corresponding diagram and record · page 602
Catchment Inlet and cover Overflow and outlet
Start at the collecting surface and work downstream. Examine the gutter, inlet screen, cover, overflow and outlet. Give every observed defect a location.
After repairs, observe the system during an actual rain. A clear outlet on a dry day cannot show whether the overflow will function under load.
Read the full method Earlier image gallery
Screen, tap, support and overflow checks
Preparation
Inspect a rainwater installation in dry conditions before relying on it. Gather its instructions, a torch, rule, measuring jug and a record sheet. Keep children away from open tanks. Do not climb onto an improvised stand or enter a storage tank. A large tank or installation beside a building needs competent assessment of its support and drainage.
Follow the water path
1. Confirm that the downpipe directs water to the intended inlet and that its screen is accessible for cleaning. Remove debris without pushing it into the tank. Secure the lid afterward. [M2]
2. Locate the high-level overflow. Check the complete discharge route for blockage, disconnection and erosion, including where it ends. [M2]
3. Open the lower tap into a suitable receiving can. Check washers, joints and shut-off operation. Verify that the can opening fits below the outlet without tipping the can.
4. Inspect support contact and stability while following the manufacturer's requirements. A full tank must not depend on a loose stack of blocks or an assumed ground capacity.
5. Observe the installation during safe rainfall from a protected position. Look for water bypassing the inlet, leaking joints or ponding beside the building. Record and correct the defect before counting the system as dependable.
Three measurements worth recording
Outlet clearance: measure vertically from the standing surface of the can to the tap outlet. If the can opening is 280 mm high and desired handling clearance is 40 mm, the example outlet height must exceed 320 mm. This is a clearance calculation, not a prescribed stand height.
Full load: 200 L water is about 200 kg. Add the actual empty-tank, fittings and support masses.
Units and terms in this account
mm millimetre, 0.001 metre · L litre, a volume unit · kg kilogram, a mass unit