A visual reading of the existing method and its evidence.
See the corresponding diagram and record · page 602
Catchment Inlet and cover Overflow and outlet
Start at the collecting surface and work downstream. Examine the gutter, inlet screen, cover, overflow and outlet. Give every observed defect a location.
After repairs, observe the system during an actual rain. A clear outlet on a dry day cannot show whether the overflow will function under load.
Read the full method Earlier image gallery
Screen, tap, support and overflow checks
Preparation
Inspect a rainwater installation in dry conditions before relying on it. Gather its instructions, a torch, rule, measuring jug and a record sheet. Keep children away from open tanks. Do not climb onto an improvised stand or enter a storage tank. A large tank or installation beside a building needs competent assessment of its support and drainage.
Follow the water path
1. Confirm that the downpipe directs water to the intended inlet and that its screen is accessible for cleaning. Remove debris without pushing it into the tank. Secure the lid afterward. [M2]
2. Locate the high-level overflow. Check the complete discharge route for blockage, disconnection and erosion, including where it ends. [M2]
3. Open the lower tap into a suitable receiving can. Check washers, joints and shut-off operation. Verify that the can opening fits below the outlet without tipping the can.
4. Inspect support contact and stability while following the manufacturer's requirements. A full tank must not depend on a loose stack of blocks or an assumed ground capacity.
5. Observe the installation during safe rainfall from a protected position. Look for water bypassing the inlet, leaking joints or ponding beside the building. Record and correct the defect before counting the system as dependable.
Three measurements worth recording
Outlet clearance: measure vertically from the standing surface of the can to the tap outlet. If the can opening is 280 mm high and desired handling clearance is 40 mm, the example outlet height must exceed 320 mm. This is a clearance calculation, not a prescribed stand height.
Full load: 200 L water is about 200 kg. Add the actual empty-tank, fittings and support masses.
Accessible reserve: water below the outlet cannot necessarily be drawn through the tap. Measure dispensable volume instead of counting every litre in the vessel.
Pass, repair or take out of service
Record each item as satisfactory, repair needed or not assessed. A blocked overflow is a failure even when the barrel holds water without leaking. Keep insect barriers intact and avoid a connection to the safe-water supply. [M12] After cleaning, repeat the flow check and note the date. Never fill a questionable structure merely to see whether it collapses. Capacity markings, installation instructions and real measurements govern the design; the diagram shows component relationships only.
Diagram notes
Inspect the inlet and outlet
Remove debris; restore screen and lid
Clearance = can opening height + margin
280 mm + 40 mm = 320 mm example
Rainwater: inspect every stage
Practical method and reference
Origin and practical purpose
Maintenance determines whether a rainwater system still behaves as drawn. Follow the actual flow through the installation rather than checking only that a tank exists. Inspection should remain possible without entering the tank or climbing an unsafe roof.
Five applications
1. Seasonal service: prepare before expected rain.
2. Fault finding: locate overflow and blocked flow.
3. Contamination control: identify roof and inlet problems.
4. Storage protection: maintain screened openings.
5. Handover: teach another person the inspection route.
Ten-step method
1. Read the installation record and identify the intended water use.
2. Inspect the catchment from the ground or another safe authorised position.
3. Check gutters and downpipes for visible obstruction or damage.
4. Inspect accessible screening and diversion components as specified by their maker.
5. Trace the inlet into the tank and confirm that fittings are intact.
6. Check the secure lid and screened vents without entering the tank.
7. Locate the overflow near the upper working water level and inspect its discharge route.
8. Inspect the draw-off fitting and check for leakage or contamination around the outlet.
9. Record faults, repairs, weather and whether stored water must be withheld from use.
10. Repeat checks after repair and after a significant storm; keep the maintenance schedule with the system record.
Units and terms in this account
mm millimetre, 0.001 metre · L litre, a volume unit · kg kilogram, a mass unit
= equals · mm millimetre, 0.001 metre