The treehouse sheet shows a timber play pavilion built around the idea of an existing tree. Its central opening, raised platform, stair and sheltered space give a designer a real spatial problem to think about. The supplied sheet does not identify a surveyed site, architect or completion date for the pictured pavilion. Kew Gardens offers a separately documented case in which drawings, site decisions and an opening date can be checked.
The original concept describes a timber platform, stairs, roof and sheltered play space. The drawing separates the tree from the frame that supports visitors. The companion plan on the next page locates them from above.
Shelter
Read the illustration’s labels
Tree canopy
Roof
Play platform
Structural frame
In the drawing: Tree canopy; Roof; Play platform; Structural frame
A pavilion among living trees
An opening around a trunk can make a platform look as if it rests on the tree. The load path has to be read in section. In the independent-post concept drawn here, a visitor’s weight acts on deck boards. The boards bear on framing, the framing on posts, and the posts on foundations. The soil supports the foundations while also supplying the living tree with water and air.
In the plan, the square posts support the deck around an opening for the trunk. The section in the linked chapter traces the load to the footing. Field measurements determine the clearance and foundation locations on a real site.
Read the illustration’s labels
Existing tree
Play platform
Structural frame
Plan
In the drawing: Existing tree; Play platform; Structural frame; Plan
