The detail sheet is headed CONNECTOR No. 1, 8 PC, and its title block identifies SPA COMPLEX, sheet 63. It combines a plan, side views, three-dimensional views and numbered component details. These views describe one connector type from several directions. The heading’s eight pieces agree with the quantity at schedule position 3. [RD-I-SPA-E1]

The plan, diameter marks and component leaders

Visible notationMeaning on this sheet
52°, 60°, 94°, 93°, 61°Five angular sectors around the plan. Their sum is 360°. They describe direction around the connector, not an erection order.
Ø80 and Ø20Diameter marks attached to the concentric features in the plan. The diameter symbol does not establish the unit.
Ø18Diameter mark shown on several numbered component drawings. It does not establish a fastener grade, fit or a complete hole specification.
1 to 6 beside leader linesIdentifiers for the components of Connector No. 1. Use their own detail views to follow shape and orientation.
8 PCEight complete connectors of this designation in the schedule, not eight holes or eight views.

The surviving image does not provide a clearly confirmed unit note, material grade, full thickness and bend specification, hole tolerances or an approved weld and fastening schedule. The visible values remain readable evidence, but those missing items cannot be supplied by assuming every bare number is millimetres. A face view gives a shape in one plane; the side and three-dimensional views are needed to understand how the parts meet.

Keep the connector designation on photographs and inspection records, including its revision and any handed or mirrored form. Record the component detail separately from the completed assembly. This prevents a component labelled 2 on sheet 63 from being ordered as Connector No. 2 from sheet 61.

SPA Complex connector schedule

This table transcribes every row of the assembly sheet’s schedule in its original order. The first column locates a row, the second names the item, and the third gives its quantity. The connector labels on the placement drawing refer to the second column. [RD-I-SPA-E1]

Schedule positionDesignation on sheet 61Quantity
1Matrix1
2Connector No. 0.11
3Connector No. 18
4Connector No. 1.11
5Connector No. 1.21
6Connector No. 24
7Connector No. 2.14
8Connector No. 2.21
9Connector No. 2.31
10Connector No. 35
11Connector No. 3.15
12Connector No. 45
13Connector No. 54
14Connector No. 5.11
15Connector No. 64
16Connector No. 6.14
17Connector No. 6.21
18Connector No. 6.31
19Connector No. 75
20Connector No. 7.15
21Connector No. 88
22Connector No. 910
23Connector No. 1010
24Connector No. 115
25Connector No. 125
26Connector No. 1310
27Connector No. 145
28Connector No. 155
29Connector No. 15.15
30Connector No. 165

The 29 connector designations total 129 complete connectors. Matrix is a separate entry with quantity 1 and an unconfirmed meaning. Counting it as a connector would change the meaning of the source rather than merely add its numbers.

Reconcile the schedule with the delivered parts

Keep each connector type under its own label and compare the physical count with the row for that exact designation. Record receipt, condition, revision and any unresolved difference. A missing No. 6.2 is not resolved by an extra No. 6, and a matching count does not prove that the two parts have the same geometry. Check the placement drawing and the applicable detail before treating a part as interchangeable.

The schedule is an inventory of named connector assemblies. It is not a list of every plate, bolt, washer, timber member or foundation component. Those quantities require their own linked drawings and schedules. Retain the complete assembly sheet and Connector No. 1 detail with this table so the identifiers lead to something the reader can inspect.

Units and terms in this account

° degree, an angle unit

m metre, a length unit · × multiplied by · m² square metre, an area unit