Inside outside
2. Service space
3. Air-control layer
4. Frame + insulation
5. Sheathing
6. Water-control layer
7. Drainage / battens
8. Outer covering
The supplied poster repeats two labels. Its thirteen numbers are transcribed in the reading guide; they are not thirteen validated construction stages.
Argentina · United States · European Union
2. Draw one continuous line for each control function
On a section through wall, roof, floor and opening, draw an uninterrupted air-control line and a separate water-control line. Mark every seam, corner, penetration and change of material. The Building America air-barrier guidance emphasises continuous connections and sealed penetrations, with the air-control layer aligned with insulation. The teaching section here applies that principle to a faceted enclosure. It is not a tested proprietary dome assembly. [E4]
3. Make a junction sample
Build a small unoccupied sample containing two adjacent panels and part of an opening, using the proposed product system. Label the inside and outside. Demonstrate how the specified tapes, gaskets or membranes join at the corner, where a fastener penetrates and where water leaves the sill. Photograph each stage before the next layer covers it. Use the manufacturer’s permitted primer, substrate condition, overlap and curing instructions. A sample confirms workmanship and compatibility questions; it does not replace the assembly’s design review.
4. Inspect before concealment
The inspection record needs the product labels, batch details where relevant, dry and clean substrate confirmation, corner photographs, penetration list, opening seals and repairs. Keep an access drawing for hidden service connections. An insulation panel with an unsealed edge may look complete from the room while air bypasses it. Do not cover a failed joint simply because the finish layer fits.
5. Read condensation as a physical event
Warm moist air reaching a sufficiently cold surface can deposit water. Roof condensation depends on indoor humidity, air leakage, temperatures and the assembly’s drying ability. Building America’s cold-weather guidance treats these as connected factors. A larger fan is not an automatic repair for a badly located vapour-control layer or an unsealed roof penetration. Record the suspected moisture route before choosing the intervention. [E5]
Insulation assembly: the printed labels and their limits
| Label | Retained description | Specification still required |
|---|---|---|
| 1 | Pine frame | Structural grade and actual species |
| 2 | Geodesic structure | Frame system and joints |
| 3 | Mineral wool, 80 mm | Product, fit and thermal specification |
| 4 | Exterior OSB, 18 mm | Grade, fastening and moisture exposure |
| 5 / 6 | Cork-based waterproofing, repeated | One layer or distinct products? |
| 7 | Glass-fibre anti-vapour mat, as printed | Actual product and vapour resistance |
| 8 / 9 | Sprayed cork finish, repeated | Product and intended side |
| 10 | OSB floor, 15 mm | Support spacing and load design |
| 11 | XPS insulation, 40 mm | Compression, fire and moisture requirements |
| 12 | Vapour barrier | Product and climate-specific position |
| 13 | Vinyl parquet / floor finish | Underlay, substrate and indoor use |
Units and terms in this account
OSB Oriented strand board · XPS Extruded polystyrene · mm millimetre, 0.001 metre
