A repair depends on people, materials and verified inputs

Input to a repairInformation needed before work starts
Work areaAccess, stable support, isolation and available space
PeopleNamed role, availability and required competence
Material or replacement partIdentity, condition, dimensions and compatible specification
Tools and equipmentCondition, capacity, guarding and inspection status
Power or other servicesCorrect supply, connection, isolation and permission to use
Records and handoverRequested result, inspection method, acceptance and recipient

A dependency is something a job needs before it can produce an acceptable result. A defined repair record names the item and its intended service, the required inputs, and the inspection that establishes acceptance. “Repair the workshop” is too broad to schedule. The six input groups in the table distinguish what must be available before the work can reach a checked handover.

An AND dependency means every named input is required. A measured assembly might require the approved parts AND a suitable tool AND a competent operator AND an inspection method. An OR choice means one of the alternatives is sufficient for this specified task. A hand method and a powered method can be alternatives only when each independently achieves the required result. They may produce different rates and may need different skills; the word 'alternative' does not erase those differences.

Put observations beside the arrows. A red status is a named unmet condition, such as 'replacement received but identification unconfirmed'. An amber status is a condition whose evidence is still incomplete. A green status includes the check and its date. Colour alone is inadequate, so every state also has a written label. Anyone using a monochrome print can still follow the decision.

The practical benefit is selective action. If one powered process is unavailable, the board should show which inspection, manual preparation or record work remains possible. It should also show what must wait. Review the board when a condition changes and after each completed job. A dependency map becomes useful through these dated observations, not through the elegance of its arrows.

Argentina workshop history Room and capability Read the ZeusC sheets Stock and maintenance

Worked schedule Robot claims and torque Earlier image gallery Reader cover

Restore a useful service, then verify the next dependency

Rebuilding systems beyond the household

A service is restored at the user’s end

Service recordQuestion or responsibility
Needed resultWho needs what service, at what condition?
Responsible operatorNamed ownership and acceptance authority.
Current evidenceObserved state, date and unresolved limits.
InputsAccess, approved parts, energy and people.
WorkTask-specific method and competent action.
VerificationCheck the actual service condition.

A pump turning is one observation. It does not establish potable water at the point of use. Keep equipment status, service delivery and quality verification distinct. In Argentina, coordinate through actual operators and arrangements; no public-service authority is implied.

Original teaching drawing · Numerical examples are invented