Arrange the room around the path of a job
Make the work visible and the workplace usable
Read the illustration’s labels
RECEIVING / ID
MATERIAL STORE
HELD ITEMS
Job tag + condition
PREPARATION
ASSEMBLY
CLEAN INSPECTION
A
| Key | Small-print annotation |
|---|---|
| A | REASON FOR HOLD |
Conceptual work zones and item routes. No scale, building dimensions, evacuation approval or machine‐clearance claim is supplied.
Begin a workshop layout by walking a representative job from arrival to departure. Where is it identified? Where can its condition be examined without mixing it with accepted parts? Where will dirty work occur, and where can a measurement be made without swarf, vibration or a crowded surface? A plan that places attractive machines in rows may still force every item through the same obstructed passage.
Conceptual room plan: separate item states and work zones
Receiving work inspection dispatch
Unscaled relationship plan. Real clearances, exits and services require site- specific design.
Original teaching drawing · Numerical examples are invented
The example drawing separates receiving, held items, material storage, preparation, assembly, clean inspection and dispatch. It is a relationship sketch, not an approved building or fireescape plan. It has no regulatory aisle dimensions. Actual access, machine envelopes, ventilation, guarding, electrical arrangements and emergency provisions depend on the equipment, building, activity and applicable requirements. Establish those with competent people before adopting a physical layout.
A helditem area needs an explicit label. An unknown part placed among accepted stock becomes difficult to distinguish later, especially when several workers share a bench. Give it a job number and a reason for the hold: identity missing, visible defect, incompatible specification or inspection pending. Keep the label attached to the item or its container throughout movement.
Walk the plan again with a second worker carrying a long or awkward item. Look for crossings, blind corners and places where a task would block another task. Ask what changes during cleaning or maintenance, when a machine is opened or temporarily unavailable. Mark these conditions in the layout record. The best plan is one that supports real work and can be revised from observed problems.
% / × / ± / ≈ / ‐ Percent / multiplied by / plus or minus / approximately / direction of relation. Mathematical and diagram symbols, interpreted in the accompanying example.
Five organizing habits, with their meanings
Read the illustration’s labels
SEIRI
Seleccionar / select
Keep, hold or relocate by reason
SEITON
Ordenar / arrange
An address for each needed item
SEISO
Limpiar / clean
Observe and record changed
condition
SEIKETSU
Mantener / maintain
Visible standard and normal state
SHITSUKE
Autodisciplina / sustain
Owner, routine and dated review
In the drawing: SEIRI; Seleccionar / select; Keep, hold or relocate by reason; SEITON; Ordenar / arrange; An address for each needed item; SEISO; Limpiar / clean; Observe and record changed condition; SEIKETSU; Mantener / maintain; Visible standard and normal state; SHITSUKE; Autodisciplina / sustain; Owner, routine and dated review
Each Japanese term is paired with its Spanish meaning and one concrete workshop record. The illustration is a new application, not an INTI certificate.
5S: five named habits, five observable records
Units and terms in this account
≈ approximately equal to · ± plus or minus; stated tolerance or uncertainty · × multiplied by · INTI Instituto Nacional de Tecnología Industrial
