Asset history: the item and the evidence stay connected

Read the illustration’s labels

FIELD

EXAMPLE / REQUIRED EVIDENCE

Identity

Local asset number + maker/model if known

Purpose

Intended service and limits

Reported symptom

Observed behaviour, conditions and date

Confirmed finding

What the examination established

Action

Part identity, method and responsible person

Result

Check conditions and acceptance basis

Status

Available / held / out of service

Next review

Owner, date or observed trigger

Suspected cause remains labelled as suspected.

A

KeySmall-print annotation
AOriginal teaching drawing · Edition 57 · Numerical examples are invented

An invented asset card separates reported symptom, confirmed finding, action and checked result. No machine‐specific servicing procedure is supplied.

An asset record is a continuing account of an identifiable item. Begin with the workshop's identifier, maker and model where known, location, purpose, relevant specification and the person responsible for its care. Add the manufacturer's instructions and the evidence needed to distinguish this item from a similar one. A photograph helps, but a photograph without an identifier becomes difficult to connect to later repair notes.

Separate three kinds of maintenance reasoning. Reactive work follows a failure or reported problem. Preventive work follows a planned interval or usage condition intended to reduce deterioration. Predictive or conditionbased work uses observations to decide when action is needed. None of these labels supplies the correct interval for every machine. Base the actual task on manufacturer guidance, service conditions, competent assessment and recorded experience.

An entry should preserve the symptom, finding, action and result as separate fields. If a loose connection was found, record where and how it was confirmed. If an item was replaced, identify the replacement and its specification. If a test was made, state the conditions and acceptance basis. 'Fixed' is too small a word to carry this information.

The workshop also needs a clear outofservice state. Attach the status to the equipment and its record so another worker cannot assume availability from appearance. Work involving hazardous energy requires the applicable taskspecific control procedure and authorized people. In United States terminology, LOTO means lockout/tagout; it is not a general instruction to improvise an isolation method. Argentina and other jurisdictions have their own applicable requirements.

Use the record to learn without erasing uncertainty. A suspected cause can remain marked as suspected until evidence supports it. Repeated symptoms deserve review even if each individual incident was quickly resolved. The purpose is a reliable history that supports the next decision and survives a change of staff, rather than an impressive list of completed actions.

LOTO ‐ Lockout/tagout. Hazardous‐energy control terminology; the acronym is not a complete isolation procedure.

Count available stock, reserved stock and replenishment separately

Keep equipment and stock recoverable

Physical stock, reservations and replenishment

The historic Edison stockroom photograph shows many differentiated materials and tools in one room. It cannot tell us how accurately its records matched those contents on the day of exposure. That question remains central in a modern workshop. A count of objects on a shelf is not automatically the quantity available for a new job.

Ledger quantityMeaning
Physical stockItems actually present and identified.
Reserved quantityStock committed to accepted jobs.
Available quantityUsable physical stock after reservations and other exclusions.
Open ordersConfirmed incoming supplies, kept separate to avoid duplicate purchasing.
Reorder policyA documented rule based on demand, lead time, uncertainty and reserve needs.

The ledger needs identity as well as quantity. Record specification, supplier, received date, location, condition and any relevant batch or shelflife information. Parts that look alike may differ in material or service rating. Mixing them in an unlabelled box destroys information that may be impossible to recover visually.

Review actual withdrawals, delivery delays, condition changes and substitutions. Physical count, commitment to a job and replenishment are separate records. A change in lead time or demand can invalidate a previous stocking policy.

The stockroom beside the machine shop

NJ ‐ New Jersey. United States state abbreviation in the historical archive identifier.

A dependency schedule is not a list of wishes

Plan the order of work and the capacity to do it

Units and terms in this account

LOTO Lockout/tagout, hazardous-energy control terminology