A site plan is a set of routes
A functional estate study. The positions are illustrative; no landscape image
supplies hidden pipe routes.
Read the illustration’s labels
1 · Arrival
2 · Workshop
3 · Stores
4 · Water
5 · Growing
6 · Drainage
Service routes need width and access
Separate clean supply, dirty return and vehicles
Number each destination, then trace people, delivery, power, clean water and
drainage. Record intersections, crossings and maintenance access.
Locations and Infrastructure · the fifteen comparison estates
3. Locate power, controls and repair access
Mark generation or supply, distribution, isolation, controls and critical loads. Place the inspection and repair route on the same plan. A machine can be physically close to a workshop but inaccessible once another service occupies the doorway. For each system, list the service it depends on and the evidence that the dependency exists.
4. Turn M1-M15 into measured deliverables
For gates and roads, ask for widths, turning and drainage levels. For lodges, ask for room use, exits and services. For workshops, ask for working clearances, lifting and extraction. For water and energy, ask for capacities, flows, protection and maintenance. For landscape and growing areas, ask for soil, irrigation, access and seasonal work. Each category needs a drawing, quantity schedule, responsible person and acceptance record; a coloured category box is only the index to that work.
Units and terms in this account
USD United States dollar
