A site plan is a set of routes
A functional estate study. The positions are illustrative; no landscape image
supplies hidden pipe routes.
Read the illustration’s labels
1 · Arrival
2 · Workshop
3 · Stores
4 · Water
5 · Growing
6 · Drainage
Service routes need width and access
Separate clean supply, dirty return and vehicles
Number each destination, then trace people, delivery, power, clean water and
drainage. Record intersections, crossings and maintenance access.
Locations and Infrastructure · the fifteen comparison estates
3. Locate power, controls and repair access
Mark generation or supply, distribution, isolation, controls and critical loads. Place the inspection and repair route on the same plan. A machine can be physically close to a workshop but inaccessible once another service occupies the doorway. For each system, list the service it depends on and the evidence that the dependency exists.
4. Turn M1-M15 into measured deliverables
For gates and roads, ask for widths, turning and drainage levels. For lodges, ask for room use, exits and services. For workshops, ask for working clearances, lifting and extraction. For water and energy, ask for capacities, flows, protection and maintenance. For landscape and growing areas, ask for soil, irrigation, access and seasonal work. Each category needs a drawing, quantity schedule, responsible person and acceptance record; a coloured category box is only the index to that work.
5. Price the same specification in each country
Argentina comes first: identify the locality, currency, supplier and quote date. Follow with a United States location and a European Union country. Compare the same scope, including delivery, installation, temporary works and recurring maintenance. Land listings and old currency conversions remain dated evidence. They are not present-day offers. Keep assumptions, quoted values and unresolved items visibly different.
Catchment yield does not establish drinking-water quality.
One millimetre of rain on one square metre gives one litre before losses. Use measured rainfall and a stated efficiency assumption.
Book III: numbered estate guides and planning budgets
From estate image to working brief
Fifteen concepts, one evidence rule
The reference images are concepts, not surveys or construction drawings. Each numbered feature connects to an explanation, a method sheet and a replaceable budget quantity. Readable source labels are marked L; unlabelled visible forms are marked V. Neither establishes an owner, location, species, engineering rating or building size.
Read a complete case
The E1 guide brings together each estate’s overview, numbered components, available interiors and dated USD and Argentine-peso scenarios. The fifteen estates are alternatives. Their costs must not be added together as one project. Component numbers belong to the individual estate.
What a blueprint still needs
A construction package needs a measured site plan, levels, foundations, structure, envelope, services, dimensions, details, schedules and local approvals. No dimension is taken from perspective artwork. Existing rectangular ZeusC sheets retain their written dimensions and credits; the estate schematics do not replace them.
Turn the concept into a record
Choose a concept; inspect its numbered register; consult the shared methods; replace assumed quantities with a measured schedule; obtain local quotations; then compare construction, staffing, annual operation and renewal separately. Land planning includes title, terrain, water, access and the infrastructure needed to maintain the estate.
Open the complete estate guide
Guide Methods Cost basis Compare
Units and terms in this account
USD United States dollar
USD United States dollar · NAHB National Association of Home Builders, United States · DOE Department of Energy · BLS Bureau of Labor Statistics, United States · % percent, parts per hundred
