Fifteen concepts, one evidence rule

The reference images are concepts, not surveys or construction drawings. Each numbered feature connects to an explanation, a method sheet and a replaceable budget quantity. Readable source labels are marked L; unlabelled visible forms are marked V. Neither establishes an owner, location, species, engineering rating or building size.

Read a complete case

The E1 guide brings together each estate’s overview, numbered components, available interiors and dated USD and Argentine-peso scenarios. The fifteen estates are alternatives. Their costs must not be added together as one project. Component numbers belong to the individual estate.

What a blueprint still needs

A construction package needs a measured site plan, levels, foundations, structure, envelope, services, dimensions, details, schedules and local approvals. No dimension is taken from perspective artwork. Existing rectangular ZeusC sheets retain their written dimensions and credits; the estate schematics do not replace them.

Turn the concept into a record

Choose a concept; inspect its numbered register; consult the shared methods; replace assumed quantities with a measured schedule; obtain local quotations; then compare construction, staffing, annual operation and renewal separately. Land planning includes title, terrain, water, access and the infrastructure needed to maintain the estate.

Open the complete estate guide

Guide Methods Cost basis Compare

Budget units and maintenance rules

Cost basis: what the numbers mean

Planning model dated 19 October 2026 | USD | Generic US-reference assumptions, not local quotations

Published anchors

B1: NAHB reports $428,215 construction cost for 2,647 ft2 in its 2024 sample, about $162/ft2 or $1,741/m2. This is a small national builder sample and excludes several sale-price components. It is not a price for a luxury estate.

B2: DOE gives 2025 Q1 PV-only modeled market prices, in 2024 dollars, of $1.98/Wdc for its commercial case and $2.95/Wdc for its residential case. Site type, size and scope differ. No universal installed price follows from them.

B13: BLS reports $19.27/hour for grounds maintenance workers in May 2025. At an assumed 2,080 paid hours, that is about $40,082 before employer costs. Estate staff roles and local employment terms differ.

Chosen inputs, not verified prices

No uniform inflation uplift has been applied to the dated anchors. Costs are not presented as Argentine prices. A real Argentine estimate needs a location, specification, dated local labor and supplier quotes, taxes, import costs and an agreed exchange-rate basis.

The model includes ordinary installed work and contractor margin in its chosen rates. Additional professional/permit allowance is 12-20% of priced works; contingency is 25-40%, both added to that same base. These percentages are assumptions, not an accuracy guarantee.

Excluded amounts stay visible

Land purchase, financing, taxes, insurance, exceptional ground works, major bridges, runway construction, aircraft, boats, livestock, feed and veterinary costs remain unpriced unless expressly scheduled. A scenario envelope is therefore not a complete purchase or development total.

NAHB : National Association of Home Builders The United States building industry association cited in the housing source.

m2 : Square metre The area of a square with sides one metre long.

DOE : Department of Energy The United States government department responsible for the energy reference cited here.

BLS : Bureau of Labor Statistics The United States agency publishing the employment or wage statistic. ARS : Argentine peso The currency in which the local price, quote or exchange rate is recorded.

Every rate below is a replaceable scenario input | No rate is a construction specification

Package / unit build USD / unit care / year

gate / set $20.0k-60.0k 2-4% of build guard / m2 $1.5k-3.0k 1-2% of build wall / m $200-600 0.5-1.5% of build road / m2 $80-160 1-2.5% of build path / m2 $40-100 1-2.5% of build house / m2 $2.5k-5.0k 1-2% of build shop / m2 $900-1.8k 1-2.5% of build barn / m2 $600-1.5k 1.5-3% of build coop / m2 $250-700 2-4% of build pasture / ha $8.0k-20.0k 4-8% of build greenhouse / m2 $150-500 2-4% of build garden / m2 $20-60 4-8% of build orchard / ha $15.0k-40.0k 4-8% of build solar / kWdc $2.0k-3.5k 1-2% of build battery / kWh $600-1.0k 1-2.5% of build water / set $30.0k-150.0k 2-4% of build tank / m3 $300-800 1-2% of build treat / set $20.0k-100.0k 4-8% of build septic / set $20.0k-100.0k 2-4% of build waste / set $10.0k-35.0k 4-8% of build

compost / set $10.0k-35.0k 4-8% of build heat / set $25.0k-100.0k 2-4% of build fuel / set $20.0k-80.0k 2-4% of build standby / set $25.0k-100.0k 2-5% of build pool / set $60.0k-150.0k 3-6% of build play / set $25.0k-90.0k 2-4% of build court / set $60.0k-150.0k 2-4% of build fountain / set $10.0k-40.0k 3-6% of build pond / set $60.0k-250.0k 1.5-4% of build dock / m2 $700-1.8k 2-4% of build pavilion / m2 $1.0k-2.5k 1-3% of build boathouse / m2 $1.4k-3.0k 1.5-3% of build hangar / m2 $1.2k-2.5k 1-2.5% of build helipad / set $100.0k-400.0k 1-2.5% of build tower / set $50.0k-250.0k 1-2.5% of build shelter / m2 $3.5k-9.0k 1-3% of build retaining / m2 $500-1.5k 0.5-1.5% of build landscape / ha $15.0k-50.0k 4-8% of build vehicle / set $80.0k-250.0k 5-10% of build light / set $20.0k-80.0k 2-4% of build

Care is a planning allowance for external service, small repairs and asset consumables. Staff, utilities and renewal reserves are separate. A reserve is money set aside, not a prediction that the same amount will be spent every year. Replace percentage allowances with an asset-by-asset service and renewal schedule.

Units and terms in this account

USD United States dollar

USD United States dollar · NAHB National Association of Home Builders, United States · DOE Department of Energy · BLS Bureau of Labor Statistics, United States · % percent, parts per hundred

NAHB National Association of Home Builders, United States · BLS Bureau of Labor Statistics, United States · USD United States dollar · k (currency) thousand, 1,000 of the stated currency · % percent, parts per hundred · kWh kilowatt-hour, energy