Measure a local plot from a recoverable baseline
Read the illustration’s labels
A
B
Shed wall
Observed
Tree P
Observed fence ≠ established property boundary
AB = 20.00 m
REFERENCE MARK A
Describe the precise
point; photograph and
date it.
REFERENCE MARK B
Reset the tape and
repeat the measurement.
Reading
Length
First
20.00 m
Repeat
Quantity
Horizontal
In the drawing: A B; Shed wall; Observed; Tree P; Observed fence ≠ established property boundary; AB = 20.00 m; REFERENCE MARK A; Describe the precise point; photograph and date it.; REFERENCE MARK B; Reset the tape and repeat the measurement.; Reading Length; First 20.00 m; Repeat 20.00 m; Quantity Horizontal
Invented baseline AB = 20.00 metres. Removable reference marks are distinguished from a fence and from any unverified property boundary.
Record a trial measurement from A to B and a second measurement after resetting the tape. Check which edge or hook defines zero. A worn end, a bent hook, a tape pulled around vegetation, or a misplaced reading can change the result. Keep the two readings in the fieldbook even when they agree. If they disagree enough to affect the intended layout, investigate the setup before calculating an average. Averaging a consistent mistake does not remove it.
The baseline in the drawing is horizontal distance. A tape laid along a sloping surface measures a longer path. On gentle, clear ground the difference may be small for a rough sketch; on steeper ground it may matter. The separate slope chapter works through the correction with explicit numbers. Do not mix a slope length for one side with a horizontal length for another and then expect a planview triangle to close.
Use surface markers where possible. Before any ground penetration, establish permission and the position of relevant buried services through the appropriate local process. The lesson needs recoverable points, not deep stakes. Keep the tape away from traffic, electrical equipment and places where another person might trip across it. An assistant should know the point being observed and the units being called out.
A recoverable baseline is the beginning of the fieldbook
Original teaching drawing · Numerical examples are invented
The historical tapecontact photograph shows two different jobs: attending to the measurement and writing it down. In a twoperson household survey, those roles can rotate, but the spoken value should be repeated back before either person moves. The record, rather than memory, becomes the shared reference.
Making the rear tape contact
United States Coast and Geodetic Survey; E. Lester Jones, publication author. NOAA historical collection. Figure 8. Photographer unrecorded. Published 1916; exposure date unrecorded
One worker observes the contact while another records. The photograph does not provide a calibration certificate.
Fig. / No. / U.S. / Tex. ‐ Figure / number / United States / Texas. Abbreviations appearing in the historical publication captions. The publication date is not the exposure date.
A / B / P / Q / R / C / D / E / F ‐ Point and station identifiers. Letters name the points in the current diagram. D denotes declination only in the north‐direction chapter.
Units and terms in this account
USCG United States Coast Guard · PTC Performance Technology Center in the Coast Guard creator credit
m metre, a length unit · = equals
NOAA National Oceanic and Atmospheric Administration
