Suppose the chosen tree point can be reached from both ends of the baseline, but a convenient perpendicular cannot be set out. Measure AP and BP instead. In the example, AB = 20.00 metres, AP = 10.00 metres and BP = the square root of 180, approximately 13.416 metres. On a plan, P must lie on a circle centred at A with radius 10 and on a circle centred at B with radius about 13.416.

The circles normally intersect twice. One possible point is above the baseline in the local drawing and the other is below it. Distances alone cannot choose between these mirror positions. The field sketch must record which side contains the actual feature. This is why a quick observational sketch remains necessary

even when the final coordinates are calculated. A calculator can solve a geometry problem without knowing which tree the observer meant.

The algebra is short enough to audit. Let x and y be the unknown local coordinates. Then x squared plus y squared equals 100, and the square of x minus 20, plus y squared, equals 180. Subtract the first equation from the second to obtain minus 40x plus 400 equals 80. Therefore x = 8. Substitution gives y squared = 36, so y is either plus 6 or minus 6 metres. The leftside field note selects plus 6.

This method uses distances; it is often called trilateration in broader surveying contexts. Triangulation instead determines a network principally through measured angles and an established length. The two methods share triangles but do not share the same observations. In the later historical French map, the triangle network represents anglebased geodetic work. Here the household example is a twodistance intersection tied to a measured baseline.

Geometry also affects sensitivity. If the two circles barely touch, a small error in either distance can move the calculated point markedly across the baseline direction. Widely separated, wellpositioned reference points usually provide a more useful intersection than two nearly identical sight lines. The diagram includes the mirror solution and shows the chosen one with a solid marker; it does not hide the ambiguity.

Finish with a separate check, such as an offset measurement or distance to a third recoverable point. Record all raw lengths before rounding the calculated coordinates. Writing 13.42 metres in a classroom table is reasonable rounding; treating that rounded value as an exact original measurement in later calculations is a different claim.

x / y ‐ Local coordinate axes. x follows A toward B; positive y is the left side when looking from A toward B.

√ / ² / ± / ≈ / | | ‐ Square root / squared / plus‐or‐minus / approximately / absolute value. Mathematical notation. The bars in the area calculation remove the sign of the ordered difference.

Traverse closure Area calculation United States history Plane‐table chapter

Contours connect equal elevations

Read relief without inventing heights

Read the illustration’s labels

100 m

110 m

120 m

130 m

A

B

Contour interval = 10 m

Summit?

60 m run

In the drawing: 100 m; 110 m; 120 m; 130 m A B; Contour interval = 10 m; Summit?

The invented hill preserves CT1: a 30‐metre rise over 60 horizontal metres gives 50 percent grade. No measured heights are attributed to the ZeusC landscape pictures.

Contours: equal elevations, stated interval, measured transect

30 m rise

30 ÷ 60 × 100 = 50%

Angle ≈ 26.6°

Invented hill. Highest closed contour does not give an exact summit height. Source poster 001 has no measured interval.

Original teaching drawing · Numerical examples are invented

A contour is a line connecting positions of equal elevation relative to a stated reference. The contour interval is the vertical difference between successive ordinary contour lines. On a map with a 10metre interval, labelled lines at 100, 110, 120 and 130 metres are successive levels. The distance between them on the page describes horizontal spacing after the map scale is considered; it is not the contour interval.

The earlier CT1 lesson used an invented circular hill. This edition retains its numerical example and draws it at a larger, explicit scale. A radial transect begins at A on the 100metre contour and ends at B on the 130metre contour, 60 horizontal metres away. The rise is 30 metres. Rise divided by run gives 0.5, so the average grade is 50 percent and the corresponding angle is about 26.6 degrees.

The calculation describes the average between A and B. It does not say every part of the hillside has that same slope. If contour spacing changes along the transect, the local slope changes too. A short, steep section and a long, gentle section can share the same endtoend average as a uniform incline. That is why the next chapter constructs a profile from a sequence of points.

A highest closed contour at 130 metres does not reveal an exact summit elevation. Under a complete ordinarycontour representation of a smooth hill with 10metre intervals, the summit would lie above 130

and below the next undrawn 140metre contour; the map may still need a spot height or other evidence to identify it. The supplied ZeusC poster gives no such interval or elevations. Its paired landscapes are qualitative illustrations, so assigning a measured summit height to them would be invented information.

Close spacing indicates steeper ground only when the compared lines use the same interval and map scale. Comparing a 5metre contour map with a 20metre contour map by visual spacing alone is misleading. Read the margin before judging slope. Index contours may be drawn thicker to aid counting, but they do not replace the stated interval.

Related supplied original: How to Read Contour Lines on Topographic Maps. The complete source image and its credit notes are in the source gallery; use the link below.

CT1 / CT2 ‐ Contour teaching companions 1 and 2. Earlier book lesson identifiers at pages 638 and 639; not measurement units.

% / ° / × ‐ Percent / degree / multiplied by. Percent grade is rise divided by horizontal run, times one hundred. Degrees measure angles. Vertical exaggeration 5× means five times.

Earlier source · p2284 Earlier source · p609 Earlier source · p639 Book contents

Earlier source · p2589 Earlier source · p2589 Earlier source · p2589 Earlier source · p2589

Units and terms in this account

m metre, a length unit · = equals · ± plus or minus; stated tolerance or uncertainty

= equals · ≈ approximately equal to · ± plus or minus; stated tolerance or uncertainty

m metre, a length unit · = equals · % percent, parts per hundred · × multiplied by · ÷ divided by · ° degree, an angle unit · ≈ approximately equal to

× multiplied by