The earlier CT2 companion distinguished average grade from local grade. The expanded example uses a 120metre horizontal line with observations every 20 metres. The elevations are 100.0, 100.4, 100.8, 104.8, 105.2, 105.6 and 106.0 metres. They are invented values on a local reference, chosen to show a short steep section within a much gentler overall rise.

From the first point to the last, elevation increases by 6 metres over 120 horizontal metres. The average grade is therefore 5 percent. Between chainages 40 and 60 metres, however, the rise is 4 metres over 20, giving a 20percent grade. A design decision based only on the average would miss that steeper section.

Plot chainage horizontally and elevation vertically. State both scales. In this drawing, one vertical metre occupies five times as much page distance as one horizontal metre, giving a vertical exaggeration of 5. This makes modest height changes readable. It also makes the drawn slope look steeper than the ground geometry. The diagram labels the exaggeration prominently and provides a separate unexaggerated slope triangle.

Join observations with a line only as an interpretation between samples. A sharp break could occur between two 20metre stations. If a path, drain or foundation depends on that detail, take additional observations at changes in slope and relevant features. A regular interval is a useful recording scheme, not a guarantee that all important terrain has been sampled.

Connect the profile back to the plan. The transect needs identifiable endpoints and a direction, so another person can locate the measured line on the ground. A height graph without that location record cannot

reliably guide a later visit. Mark crossings such as a wall, channel or existing path with their chainage and a note about how the elevation was obtained.

The profile can support questions about access, grading or water flow, but it does not supply every answer. Soil, surface condition, outlet level, regulations and the intended use remain relevant. The chapter’s result is a clearer measurement brief: it identifies where more detailed observations are needed and prevents a small average number from hiding a difficult local condition.

Earlier source · p2284 Earlier source · p609 Earlier source · p640 Book contents

Worked level loop Write a survey brief Earlier CT2 lesson

True, magnetic and grid north name different directions

Three norths and a dated compass correction

Read the illustration’s labels

TRUE NORTH

MAGNETIC

GRID

DECLINATION D

East-positive angle

from true to magnetic

north.

GRID CONVERGENCE γ

Here defined east-

positive from true to

grid north.

In the drawing: TRUE NORTH; MAGNETIC; GRID

Three arrows are separated for explanation. Gamma is defined here as east‐positive grid convergence; actual local angles have not been supplied.

True, magnetic and grid north: define the reference

True bearing = magnetic bearing + D

True bearing = grid bearing + γ (under the stated convention)

Original teaching drawing · Numerical examples are invented

Units and terms in this account

% percent, parts per hundred · m metre, a length unit · = equals · × multiplied by

= equals · NOAA National Oceanic and Atmospheric Administration