Counted build / durable levelling version

Argentina / ARS

Straight timber, approximately 30 × 20 mm, 1,500 mm legs 2 piece 7,000.00

Crossbar, approximately 30 × 20 × 900 mm 1 piece 2,500.00

Plywood triangular joint gussets, approximately 6 mm 2 piece 3,600.00

Wood screws, 3 × 25 mm, pack of 20 1 pack 2,500.00

Wood screws, 3 × 35 mm, pack of 10; four for the crossbar 1 pack 1,500.00

Cord for plumb line, 1.8 m needed 2 m 360.00

Small plumb bob or tied metal weight, about 100 g 1 piece 4,000.00

Clear flexible water hose, about 8 mm internal bore 10 m 13,000.00

Straight staff, approximately 30 × 20 × 1,200 mm 2 piece 6,000.00

Cable ties for hose retention, pack of 20; eight used 1 pack 1,800.00

Self‐adhesive metric staff scales, 1 m 2 piece 3,600.00

Two hard foot pads and 12 mm check shim, supplied offcuts 1 set 2,000.00

Water‐based finish, 250 mL 1 container 6,000.00

Total for this list: ARS 53,860.00

United States / USD

Straight timber, approximately 30 × 20 mm, 1,500 mm legs 2 piece 8.00

Crossbar, approximately 30 × 20 × 900 mm 1 piece 3.00

Plywood triangular joint gussets, approximately 6 mm 2 piece 4.00

Wood screws, 3 × 25 mm, pack of 20 1 pack 3.00

Wood screws, 3 × 35 mm, pack of 10; four for the crossbar 1 pack 2.00

Cord for plumb line, 1.8 m needed 2 m 0.40

Small plumb bob or tied metal weight, about 100 g 1 piece 4.00

Clear flexible water hose, about 8 mm internal bore 10 m 15.00

Straight staff, approximately 30 × 20 × 1,200 mm 2 piece 7.00

Cable ties for hose retention, pack of 20; eight used 1 pack 2.00

Self‐adhesive metric staff scales, 1 m 2 piece 4.00

Two hard foot pads and 12 mm check shim, supplied offcuts 1 set 2.00

Water‐based finish, 250 mL 1 container 7.00

Total for this list: USD 61.40

European Union, Spain / EUR

Straight timber, approximately 30 × 20 mm, 1,500 mm legs 2 piece 7.00

Crossbar, approximately 30 × 20 × 900 mm 1 piece 2.50

Plywood triangular joint gussets, approximately 6 mm 2 piece 3.60

Wood screws, 3 × 25 mm, pack of 20 1 pack 2.50

Wood screws, 3 × 35 mm, pack of 10; four for the crossbar 1 pack 1.80

Cord for plumb line, 1.8 m needed 2 m 0.36

Small plumb bob or tied metal weight, about 100 g 1 piece 3.50

Clear flexible water hose, about 8 mm internal bore 10 m 13.00

Straight staff, approximately 30 × 20 × 1,200 mm 2 piece 6.00

Cable ties for hose retention, pack of 20; eight used 1 pack 1.80

Self‐adhesive metric staff scales, 1 m 2 piece 3.60

Two hard foot pads and 12 mm check shim, supplied offcuts 1 set 1.80

Water‐based finish, 250 mL 1 container 6.00

Total for this list: EUR 53.46

Workshop / step by step

A-frame and two-staff water-level kit / build sequence

Two 1,500 mm legs, a 900 mm crossbar, nominal 1,200 mm foot spacing, two 1,200 mm staffs and one 10 m clear hose. The working span must leave slack and upright hose ends.

A-frame and hose / assembly dimensions

Millimetres / actual foot spacing and reversal determine the calibration

Read the illustration’s labels

A-frame level: crossbar, line and reversible feet

Restored teaching geometry from the stated dimensions; check the assembled frame.

Leg 1,500 mm

Two equal legs

meet at the apex.

Crossbar 900 mm

Plumb line

Bob hangs

below the bar

About

500 mm

1,200 mm between foot reference points

Reverse the feet on the same pads; use the midpoint of the two readings.

Contemporary teaching drawing restored from the supplied dimensions and assembly text.

Crossbar height is approximate. Trace actual joints and keep the plumb line clear of the frame.

1,200 each / 10 m hose

Foot references: 1,200

Two staffs

In the drawing: 1,200 each / 10 m hose

Check both physical references

Exchange the frame feet on fixed pads. Check the hose with staffs side by side, then transfer a known 100 mm block height.

Instrument scale is schematic. Keep both hose ends open and the liquid continuous, with no trapped bubbles.

1. Lay the two 1,500 mm legs on a flat floor. Set foot reference points 1,200 mm apart and bring the top reference points together. Check equal side lengths. The ideal apex is about 1,375 mm above the foot line; record the actual assembled geometry.

2. Fit the 900 mm crossbar across the legs approximately 500 mm above the foot line. Trace the real joint positions. Add the two gussets near the apex. Use twelve 3 × 25 mm screws through the 6 mm gussets into the legs and four 3 × 35 mm screws through the 20 mm crossbar into the legs. Drill pilot holes and confirm actual thicknesses keep all tips contained.

3. Suspend the bob from a fixed apex mark. Adjust the line length so it passes the crossbar freely and hangs below it. Add a replaceable reading strip on the bar. The bob must not drag or touch the legs.

4. Put the feet on two marked pads and take a reading. Reverse the frame on those same pads and take another. Mark the midpoint as the working zero, repeat the reversal, and record the spread. Calibrate the 1 percent grade mark with a measured 12 mm shim.

5. Attach one hose end to each 1,200 mm staff with four loose ties per staff. Keep the hose open at both ends and avoid pinching it.

6. Secure the metric scales to a common foot datum. Leave at least 200 mm free above the normal working water level.

Units and terms in this account

mm millimetre, 0.001 metre · m metre, a length unit · ARS Argentine peso · × multiplied by · g gram, 0.001 kilogram

m metre, a length unit · mm millimetre, 0.001 metre · mL millilitre, 0.001 litre · ARS Argentine peso · USD United States dollar · × multiplied by · g gram, 0.001 kilogram

g gram, 0.001 kilogram · mm millimetre, 0.001 metre · m metre, a length unit · × multiplied by · mL millilitre, 0.001 litre · EUR Euro

mm millimetre, 0.001 metre · m metre, a length unit

mm millimetre, 0.001 metre · × multiplied by