Argentina: learning the line aboard a training ship

Open the complete related drawing · page 1889

One teaching mast · support and moving lines

Estay / stay: supports fore-and-aft

Obenque / shroud: side support

Driza / halyard: raises

Escota / sheet: controls sail

Conceptual arrangement · not the Sarmiento rigging plan

Original teaching drawing

shows why seamanship was taught through repeated practical work, not merely through memorised names.

Presidente Sarmiento under bare yards

Detroit Publishing Company, publisher; photographer unrecorded. Library of Congress. [1909]

The related illustration appears earlier in this volume · page 1890

A bilingual rope vocabulary that names the parts

Read the illustration’s labels

CROSSING LOOP

Standing part / firme

Working end / chicote

In the drawing: CROSSING LOOP

Large parts diagram: one bight has no crossing; the adjacent loop does. Labels remain outside the rope path.

A reader can recognise a knot’s outline yet still follow the wrong end when tying it. Begin with the material in the hand. The working end is the end being moved; chicote is the corresponding Spanish nautical term for an end of a line. The standing part, or firme in the practical vocabulary used here, is the length leading away from the knot. A bight, seno, doubles the cord back without a crossing. A crossing creates a loop or turn whose orientation must be inspected.

These words describe roles, not permanent properties of a particular piece of rope. Turn the sample around and the working end remains the end you are manipulating. Change the intended load direction and the same visible curve may behave differently. A drawing should therefore mark both the end and the direction of pull. Blue and rust colours in this reader distinguish different lines or stages; they do not certify the fibre or strength of the material.

Place two cords of contrasting colour on a flat board. Fold one into a Ushaped bight and leave both legs visible. Make a crossing loop in the other. Trace each with a finger while naming the route. Then remove your hand and compare the drawing with the physical sample. If a strand disappears under another, mark its entry and exit before pulling anything tight. Much confusion comes from tightening too early, when the crossing that needs inspection is already hidden.

Read the rope before naming the knot

Bight / seno

A fold without a crossing

One strand passes over the other