Use surface markers where possible. Before any ground penetration, establish permission and the position of relevant buried services through the appropriate local process. The lesson needs recoverable points, not deep stakes. Keep the tape away from traffic, electrical equipment and places where another person might trip across it. An assistant should know the point being observed and the units being called out.

The finished baseline entry contains the date, observers, instrument identification, endpoint descriptions, two readings and any conditions that could affect them. A statement such as tape slightly sagged is better

than leaving uncertainty invisible. Later, a third independently measured line will test the drawing. That test is valuable precisely because it does not merely repeat the calculation used to create the first positions.

Making the rear tape contact

The related illustration appears earlier in this volume · page 1901

Locate a feature by chainage and offset

Measure a local plot from a recoverable baseline

Read the illustration’s labels

A

B

P (8,6)

6.00 m

BP check

≈ 13.416 m

POINT DEFINITION

P = selected tree

centre. A canopy edge is

another feature.

Point

Chainage

Side

P

8.00 m

Left

Q

14.00 m

R

17.00 m

Right

Fieldbook also records

each offset: P 6.00 m; Q

3.00 m; R 2.00 m.

In the drawing: A B; P (8,6); 6.00 m; BP check ≈ 13.416 m; POINT DEFINITION; P = selected tree centre. A canopy edge is another feature.; Point Chainage Side; P 8.00 m Left; Q 14.00 m Left; R 17.00 m Right; Fieldbook also records each offset: P 6.00 m; Q 3.00 m; R 2.00 m.

P is 8.00 metres along AB and 6.00 metres to its left. The independent BP distance checks the offset geometry.

Chainage plus a perpendicular offset locates P

8.00 m

Original teaching drawing · Numerical examples are invented

An offset locates a point by two measurements from the baseline. Chainage is distance along the baseline from its declared starting point. The offset is the perpendicular distance from that line to the feature. For the invented tree centre P, the chainage from A is 8.00 metres and the left offset is 6.00 metres. With the local axes already defined, its coordinates are therefore x = 8.00 and y = 6.00 metres.

The word perpendicular does important work. A diagonal tape from an arbitrary place on the baseline is not the offset. Establish a right angle with an appropriate square, sighting instrument or checked geometric arrangement. A 3-4-5 triangle is a practical demonstration: sides of 3 and 4 metres meet at a right angle when the opposite side is exactly 5 metres in ideal geometry. Real tapes, marker thickness and alignment introduce uncertainty, so the triangle is a checkable method, not a guarantee of perfect surveying.

Decide what part of the feature is being located. A tree has a trunk edge, an approximate trunk centre and a canopy extent. They are not the same point. A shed has walls, eaves and perhaps an overhanging gutter. Record the feature definition next to its identifier. In the teaching drawing, P means the chosen tree centre, while a dashed outline shows an approximate canopy. The canopy is deliberately identified as estimated.

Measure the chainage from the same baseline origin each time. Do not add a sequence of short, unrecorded steps and call the final total a direct observation. A feature schedule might say P: 8.00 left 6.00; Q: 14.00 left 3.00; R: 17.00 right 2.00. The side word matters because a positive distance alone does not say which side of the baseline contains the feature. On the drawing, rightside offsets receive negative y values under this book’s convention.

Units and terms in this account

m metre, a length unit · = equals · ≈ approximately equal to

m metre, a length unit · = equals · ± plus or minus; stated tolerance or uncertainty