Measure a local plot from a recoverable baseline
Read the illustration’s labels
A
B
P (8,6)
6.00 m
BP check
≈ 13.416 m
POINT DEFINITION
P = selected tree
centre. A canopy edge is
another feature.
Point
Chainage
Side
P
8.00 m
Left
Q
14.00 m
R
17.00 m
Right
Fieldbook also records
each offset: P 6.00 m; Q
3.00 m; R 2.00 m.
In the drawing: A B; P (8,6); 6.00 m; BP check ≈ 13.416 m; POINT DEFINITION; P = selected tree centre. A canopy edge is another feature.; Point Chainage Side; P 8.00 m Left; Q 14.00 m Left; R 17.00 m Right; Fieldbook also records each offset: P 6.00 m; Q 3.00 m; R 2.00 m.
P is 8.00 metres along AB and 6.00 metres to its left. The independent BP distance checks the offset geometry.
Chainage plus a perpendicular offset locates P
8.00 m
Original teaching drawing · Numerical examples are invented
An offset locates a point by two measurements from the baseline. Chainage is distance along the baseline from its declared starting point. The offset is the perpendicular distance from that line to the feature. For the invented tree centre P, the chainage from A is 8.00 metres and the left offset is 6.00 metres. With the local axes already defined, its coordinates are therefore x = 8.00 and y = 6.00 metres.
The word perpendicular does important work. A diagonal tape from an arbitrary place on the baseline is not the offset. Establish a right angle with an appropriate square, sighting instrument or checked geometric arrangement. A 3-4-5 triangle is a practical demonstration: sides of 3 and 4 metres meet at a right angle when the opposite side is exactly 5 metres in ideal geometry. Real tapes, marker thickness and alignment introduce uncertainty, so the triangle is a checkable method, not a guarantee of perfect surveying.
Decide what part of the feature is being located. A tree has a trunk edge, an approximate trunk centre and a canopy extent. They are not the same point. A shed has walls, eaves and perhaps an overhanging gutter. Record the feature definition next to its identifier. In the teaching drawing, P means the chosen tree centre, while a dashed outline shows an approximate canopy. The canopy is deliberately identified as estimated.
Measure the chainage from the same baseline origin each time. Do not add a sequence of short, unrecorded steps and call the final total a direct observation. A feature schedule might say P: 8.00 left 6.00; Q: 14.00 left 3.00; R: 17.00 right 2.00. The side word matters because a positive distance alone does not say which side of the baseline contains the feature. On the drawing, rightside offsets receive negative y values under this book’s convention.
The resulting fieldbook is more informative than a polished outline alone. Another reader can see the origin, side convention and observations that produced every point. That makes later additions possible without rebuilding the whole sketch from memory.
Find a point from two distances
Read the illustration’s labels
A
B
P (8,+6)
Mirror (8,−6)
10 m
√180 m
AB = 20 m
Field note: P is on
the LEFT when
looking from A
toward B.
Distances alone
cannot choose the
side.
x² + y² = 100 (x − 20)² + y² = 180
Subtract: −40x + 400 = 80 x = 8; y = ±6 metres
Open the complete related drawing · page 1902
In the drawing: A B; P (8,+6); Mirror (8,−6); 10 m √180 m; AB = 20 m; Field note: P is on the LEFT when looking from A toward B.; Distances alone cannot choose the side.; x² + y² = 100 (x − 20)² + y² = 180; Subtract: −40x + 400 = 80 x = 8; y = ±6 metres
The two circle intersections are (8, +6) and (8, −6) metres. The field sketch supplies the side; the distance equations alone do not.
Two measured radii give two possible intersections
Units and terms in this account
m metre, a length unit · = equals · ≈ approximately equal to
m metre, a length unit · = equals · ± plus or minus; stated tolerance or uncertainty
m metre, a length unit · mm millimetre, 0.001 metre · cm centimetre, 0.01 metre