Horizontal =
√(5² − 0.5²)
≈ 4.9749 m
Grade ≈ 10.05%
Angle ≈ 5.739°
Tape = 5.000 m
Rise
0.500 m
In the drawing: Horizontal =; √(5² − 0.5²); ≈ 4.9749 m; Grade ≈ 10.05%; Angle ≈ 5.739°
A 5.000‐metre slope distance and 0.500‐metre rise give a 4.9749‐metre horizontal run. The vertical scale in the drawing is enlarged and labelled.
Inclined distance, horizontal run and rise are different
Horizontal ≈ 4.9749 m
Vertical scale enlarged to make the rise visible. The shape on this page is not the true slope angle.
Original teaching drawing · Numerical examples are invented
A plan is a view of horizontal position. A tape laid up a slope measures the inclined distance between its endpoints. To relate that reading to a plan, the height difference or slope angle must also be known with sufficient reliability. The geometric example uses a straight tape length of 5.000 metres and an independently known rise of 0.500 metre. It assumes the tape is straight between the endpoints, without sag or bends around vegetation.
The horizontal distance is the square root of 5.000 squared minus 0.500 squared. That is the square root of 24.75, approximately 4.9749 metres. The inclined reading exceeds the horizontal distance by about 0.0251 metre, or 25.1 millimetres. Whether that difference matters depends on the task. It is visible in a precise settingout record; it may be smaller than other uncertainties in a rough exploratory sketch.
The risetohorizontaldistance ratio is about 0.1005, or a grade of 10.05 percent. The slope angle is about 5.739 degrees. Percent grade and degrees are different quantities. Ten percent does not mean ten degrees, and a 100percent grade corresponds to a 45degree slope under the usual riseoverrun definition. The figure keeps those labels separate so the same number is not accidentally copied into the wrong field.
An alternative is to measure in short horizontal steps, with each segment level and its endpoint projected vertically to the next ground mark. This requires suitable equipment and careful point transfer. Do not stretch an unstable tape high above the ground or over an unsafe drop merely to make it horizontal. If the terrain prevents a dependable household measurement, record the limitation and change the method or seek suitable assistance.
The same distinction matters when measuring along a curved path. Its walked length is not the straight horizontal separation of its ends. A pathlength estimate can help purchase edging, while a plan coordinate needs a different observation. Naming the quantity prevents a useful measurement from being misapplied.
A loop reveals an error; it does not explain it
Read the illustration’s labels
A
B
C
D
20.00 m east
19.96 m west
15.00 m
north
14.97 m
south
Independent diagonal
0.04 m east
0.03 m north
In the drawing: A B; C D; 20.00 m east; 19.96 m west; 15.00 m north; 14.97 m; south; Independent diagonal
The component residual is 0.04 metre east and 0.03 metre north, giving 0.05 metre closure. The displayed gap is enlarged for visibility.
Closure checks the loop; independent checks test more
Gap inset exaggerated: √(0.04² + 0.03²) = 0.05 m.
69.93 m total ÷ 0.05 m closure ≈ 1:1,400: an internal check, not an acceptance rule
Units and terms in this account
m metre, a length unit · % percent, parts per hundred · ° degree, an angle unit · = equals · ≈ approximately equal to
m metre, a length unit · ≈ approximately equal to
m metre, a length unit · = equals · ≈ approximately equal to · ÷ divided by