Connect the profile back to the plan. The transect needs identifiable endpoints and a direction, so another person can locate the measured line on the ground. A height graph without that location record cannot reliably guide a later visit. Mark crossings such as a wall, channel or existing path with their chainage and a note about how the elevation was obtained.
Match the evidence to the decision
Write the survey brief before drawing the proposal
A survey brief connects observations to decisions
Read the illustration’s labels
Decision
Needed evidence
Status
Planting area
Measured outline + area
Worked example
Tree clearance
Defined trunk + canopy
Centre checked; canopy estimated
Path gradient
Located profile + levels
More local detail may be needed
Drainage fall
Outlet + intermediate levels
Not established by contours
Property boundary
Appropriate boundary evidence
Not established by this sketch
OBSERVED
Features and raw
readings
PROPOSED
Design choices on a
dated layer
UNRESOLVED
State the next
observation
In the drawing: Decision Needed evidence Status; Planting area Measured outline + area Worked example; Tree clearance Defined trunk + canopy Centre checked; canopy estimated; Path gradient Located profile + levels More local detail may be needed; Drainage fall Outlet + intermediate levels Not established by contours; Property boundary Appropriate boundary evidence Not established by this sketch; OBSERVED; Features and raw readings; PROPOSED; Design choices on a dated layer; UNRESOLVED; State the next observation
Original teaching drawing · Numerical examples are invented
The evidence table links each decision to observations, checks and unresolved information. The local drawing remains separate from a proposed layout.
A survey brief states the decision that the measurements must support. Measuring a garden for seed quantities, locating a new accessible path and establishing a disputed boundary are different tasks. Their required evidence, expertise and consequences differ. A preliminary household fieldbook can describe the site well without being suitable for every later use.
Start with a sentence such as: prepare a measured sketch of existing beds, paths, visible walls and selected trees to compare two planting layouts. Identify the area covered, the date and the features that must be located. State what will remain approximate, such as canopy outlines or inaccessible corners. If elevations matter, specify which local reference will be used and which points need direct observations.
Build a short evidence table. For each feature, record its identifier, method, observed values, independent check and uncertainty or limitation. For P, the tree point, the offset method gives 8.00 and 6.00 metres; a distance from B provides a separate check. For a hidden drain outlet, the honest entry may be not observed. Leaving it blank and then drawing a smooth proposed fall would disguise the missing evidence.
In Argentina, record the relevant national or provincial source when geographic control is required, and retain the exact coordinateframe label. In the United States, read the actual map’s reference information rather than assuming that every sheet uses the same datum or units. Europe and other regions introduce further systems and historical units. A regional order for reading is not a reason to force all records into one unexplained template.
The final plan should distinguish existing observations from proposals through a legend and revision date. A proposed path width belongs to a design layer; it is not a measurement of an existing feature. A fence drawn from observation belongs to a physicalfeature layer; its ownership significance is a separate question. Keeping those meanings visible prevents the proposal from rewriting the evidence.
Conclude the brief with a decision log. State which comparison the current evidence supports, which question remains unresolved and what observation would resolve it. For example, two planting layouts can be compared for usable area while drainage remains undecided pending outlet levels. This is a complete result for the stated stage of work: the record tells the next person what can be used and what still needs to be measured.
True, magnetic and grid north name different directions
Three norths and a dated compass correction
True, magnetic and grid north: define the reference
Read the illustration’s labels
TRUE NORTH
MAGNETIC
GRID
DECLINATION D
East-positive angle
from true to magnetic
north.
GRID CONVERGENCE γ
Here defined east-
positive from true to
grid north.
Open the complete related drawing · page 1907
In the drawing: TRUE NORTH; MAGNETIC; GRID
True bearing = magnetic bearing + D
True bearing = grid bearing + γ (under the stated convention)
Units and terms in this account
% percent, parts per hundred · m metre, a length unit · = equals · × multiplied by
= equals
