BARCELONA, WITH A SPECIFIC PHOTOGRAPH Baldomer Gili i Roig photographed the Sagrada Família under construction in 1905. The reproduced image is a modern copy of the original glass negative, held by the Museu d’Art Jaume Morera. It replaces an unverified timeline collage with one dated view. The two foreground figures are not named here because the consulted record does not identify them. [D884-D885]

THE HISTORICAL SEQUENCE The basilica’s own history records the foundation stone on 19 March 1882, Gaudí taking over in 1883 and his death in 1926. In 1936, plans and photographs were burned and plaster models damaged. Later work relied on surviving material and reconstruction from published drawings and photographs. These specific events explain why a construction archive is part of the infrastructure. [D886]

THE ARGENTINE APPLICATION For a school, workshop or estate intended to serve several generations, fund the records as well as the first building campaign. Keep measured drawings, decisions, material specifications, photographs of concealed work and a repair history. The purpose is continuity: the next team must be able to distinguish what was built from what was merely proposed.

Baldomer Gili i Roig, Sagrada Família, 1905. Museu d’Art Jaume Morera; public-domain reproduction via Commons. Full frame, unchanged. [D884-D885]

A PHOTOGRAPH’S PROPER LIMIT This view documents one stage of the building. It supplies no verified section sizes, foundations, material strengths or present completion status. The historical lesson concerns construction continuity; it is not a plan for reproducing the basilica.

Make the next builder’s record before you leave

RECORD THE CONCEALED WORK Before covering a pipe, cable, joint or foundation, record its location, scale, date, approved drawing revision and inspection result. Photograph from a position that another person can recognise. Keep the original file and a labelled copy. Link a change made on site to the person who authorised it and the drawing that it supersedes. BUDGET AN ARCHIVE AS AN OPERATING SERVICE For an illustrative four-stage project, require a record review at site preparation, structure, services and handover. A provisional allowance of two labour-hours per stage is eight hours; it is a planning allowance, not a professional fee. Price photography, survey updates, printing, backups and storage separately. The archival work should be an explicit contract deliverable with a named reviewer.

Project stageRecord retained
Site preparationLevels, existing services, measured drawing, photograph and review.
StructureMaterial specifications, joints and concealed work.
ServicesRoutes, isolation points and approved changes.
HandoverAs-built drawings, inspection results and repair log.