Survey coverage and observed marks
Illustrative coverage figures, not historical site counts. An inaccessible surface remains unexamined; it does not become evidence that no mark exists.
| Sector | Eligible stones | Examined | Marks observed |
|---|---|---|---|
| A | 30 | 24 | 6 |
| B | 30 | 15 | 5 |
| C | 30 | 30 | 9 |
| D | 30 | 0 | Unknown |
| Total | 120 | 69 | 20 among the examined stones |
The team examined 24 + 15 + 30 = 69 stones. Sector D has no observation. Record “not examined” rather than converting inaccessible surfaces into zero marks.
Twenty examined stones carry marks. This proportion describes the examined stones only. The unexamined 51 stones prevent a whole-building prevalence claim without further evidence.
A replacement part retains a traceable identity
| Identity field | Reference information |
|---|---|
| Assembly and component | Unique part identifier connected to its drawing. |
| Revision | Current issue, previous issue and the reason for change. |
| Material and orientation | Specified material and its direction where relevant. |
| Inspection | Measured result, acceptance criterion and responsible person. |
The label connects the part to its record. It does not establish that material, dimensions or workmanship are suitable. Inspection criteria must come from the actual design. Keep an old component’s identity when it is retired so its replacement and the reason for change can be traced.
Correct a record without erasing the evidence
A correction preserves the first observation and identifies which interpretation changed.
| Record field | Information to retain |
|---|---|
| Observation | Visible extent and unit; original photograph or drawing. |
| Incomplete boundary | Identify the broken or hidden edge; full size remains unknown. |
| Interpretation | Separate the inferred complete form from what was observed. |
| Correction | Keep the original entry and add the dated correction and reason. |
| Responsibility | Name the recorder and reviewer without attributing an unknown maker. |
Keep original images, a location overview, an editable drawing, units, the recorder, revision history and the source of each interpretation. Store a readable copy beside the working files. Someone returning years later should be able to tell what was seen, what was inferred and what was corrected.
Passing one workshop operation to a new worker
The training document sets out the stages of Job Instruction.
Read the object record
The 1942 Job Instruction material broke instruction into a practical sequence: prepare the worker, present the job, have the learner try it and follow up. The point of the demonstration was to make the critical operation and its reasons visible.
Four stages from a 1942 instructor manual
Historical method beside its source · current examples still require task-specific standards
Units and terms in this account
= equals
