| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 23. Central island and planted grounds Method M15 Keep vegetation clear of approach sightlines and service routes. | 1.5 ha | $22.5k-75.0k | $900-6.0k |
Axial estate and growing grid: cost and operation
Construction scenario
Visible feature allowances $4.08m-8.77m
Proposed missing services $180.0k-640.0k
Priced works subtotal $4.26m-9.41m
Professional / permit allowance $511.1k-1.88m
Contingency on priced works $1.06m-3.76m
Scenario envelope, exclusions apply $5.84m-15.05m
Annual operating provision
Asset care and minor repairs $47.0k-239.2k
Staff: assumed 6 full-time equivalents $300.0k-540.0k
Utilities and operating energy $30.0k-90.0k
Renewal reserve, set aside $42.6k-188.2k
Funded annual subtotal $419.6k-1.06m
Staff: $50k-90k per FTE/year, chosen loaded allowance. Utilities: $5k-15k per FTE/year as a coarse placeholder, not an energy calculation. Replace both with rosters and metered demand. Taxes, insurance, food, feed, aircraft and exceptional works are
additional.
Services proposed, not shown or verified
P4 Wastewater completion allowance: $20.0k-100.0k P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k
Utilities need protected working space
The rear service strip compresses food, water and energy systems. Establish clear equipment boundaries, maintenance routes and clean-water protection before reproducing this arrangement.
Day and night responsibilities
Open prices: No additional labelled feature is unpriced, but the global exclusions still apply.
Axial Estate And Growing Grid: Argentine Pesos
Retained scenario conversion
| Component | Build / ARS million | Care / ARS million per year |
|---|---|---|
| 1. Main gate | 30.800 to 92.400 | 0.616 to 3.696 |
| 2. Security post | 92.400 to 184.800 | 0.924 to 3.696 |
| 3. Perimeter fence | 277.200 to 831.600 | 1.386 to 12.474 |
| 4. Driveway entry and loop | 492.800 to 985.600 | 4.928 to 24.640 |
| 5. Garage and workshop | 415.800 to 831.600 | 4.158 to 20.790 |
| 6. Vehicle bay | 207.900 to 415.800 | 2.079 to 10.395 |
| 7. Guest house | 962.500 to 1,925.000 | 9.625 to 38.500 |
| 8. Main house | 2,695.000 to 5,390.000 | 26.950 to 107.800 |
| 9. Safe-room entrance label | 323.400 to 831.600 | 3.234 to 24.948 |
| 10. Food storage | 138.600 to 277.200 | 1.386 to 6.930 |
| 11. Service area | 49.280 to 98.560 | 0.493 to 2.464 |
| 12. Standby enclosure | 38.500 to 154.000 | 0.770 to 7.700 |
| 13. Battery storage | 92.400 to 154.000 | 0.924 to 3.850 |
| 14. Solar array | 184.800 to 323.400 | 1.848 to 6.468 |
| 15. Well and pump house | 46.200 to 231.000 | 0.924 to 9.240 |
| 16. Water storage | 18.480 to 49.280 | 0.185 to 0.986 |
| 17. Water filtration | 30.800 to 154.000 | 1.232 to 12.320 |
| 18. Orchard | 11.550 to 30.800 | 0.462 to 2.464 |
| 19. Greenhouse | 57.750 to 192.500 | 1.155 to 7.700 |
| 20. Vegetable gardens | 27.720 to 83.160 | 1.109 to 6.653 |
| 21. Chicken coop | 23.100 to 64.680 | 0.462 to 2.587 |
| 22. Chicken tunnels and runs | 30.800 to 86.240 | 0.616 to 3.450 |
| 23. Central island and planted grounds | 34.650 to 115.500 | 1.386 to 9.240 |
BUILD ENVELOPE ARS M 8,986.693 to 23,181.312 ANNUAL FUND ARS M 646.192 to 1,628.381
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres · m² square metre, an area unit
m (currency) million, 1,000,000 of the stated currency · k (currency) thousand, 1,000 of the stated currency
ARS Argentine peso
ARS Argentine peso · CC0 Creative Commons Zero, a public-domain dedication tool
