Feature, method and purposeAssumed quantityBuild USDCare/year USD
23. Central island and planted grounds Method M15 Keep vegetation clear of approach sightlines and service routes.1.5 ha$22.5k-75.0k$900-6.0k

Axial estate and growing grid: cost and operation

Construction scenario

Visible feature allowances $4.08m-8.77m

Proposed missing services $180.0k-640.0k

Priced works subtotal $4.26m-9.41m

Professional / permit allowance $511.1k-1.88m

Contingency on priced works $1.06m-3.76m

Scenario envelope, exclusions apply $5.84m-15.05m

Annual operating provision

Asset care and minor repairs $47.0k-239.2k

Staff: assumed 6 full-time equivalents $300.0k-540.0k

Utilities and operating energy $30.0k-90.0k

Renewal reserve, set aside $42.6k-188.2k

Funded annual subtotal $419.6k-1.06m

Staff: $50k-90k per FTE/year, chosen loaded allowance. Utilities: $5k-15k per FTE/year as a coarse placeholder, not an energy calculation. Replace both with rosters and metered demand. Taxes, insurance, food, feed, aircraft and exceptional works are

additional.

Services proposed, not shown or verified

P4 Wastewater completion allowance: $20.0k-100.0k P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k

Utilities need protected working space

The rear service strip compresses food, water and energy systems. Establish clear equipment boundaries, maintenance routes and clean-water protection before reproducing this arrangement.

Day and night responsibilities

Open prices: No additional labelled feature is unpriced, but the global exclusions still apply.

Axial Estate And Growing Grid: Argentine Pesos

Retained scenario conversion

ComponentBuild / ARS millionCare / ARS million per year
1. Main gate30.800 to 92.4000.616 to 3.696
2. Security post92.400 to 184.8000.924 to 3.696
3. Perimeter fence277.200 to 831.6001.386 to 12.474
4. Driveway entry and loop492.800 to 985.6004.928 to 24.640
5. Garage and workshop415.800 to 831.6004.158 to 20.790
6. Vehicle bay207.900 to 415.8002.079 to 10.395
7. Guest house962.500 to 1,925.0009.625 to 38.500
8. Main house2,695.000 to 5,390.00026.950 to 107.800
9. Safe-room entrance label323.400 to 831.6003.234 to 24.948
10. Food storage138.600 to 277.2001.386 to 6.930
11. Service area49.280 to 98.5600.493 to 2.464
12. Standby enclosure38.500 to 154.0000.770 to 7.700
13. Battery storage92.400 to 154.0000.924 to 3.850
14. Solar array184.800 to 323.4001.848 to 6.468
15. Well and pump house46.200 to 231.0000.924 to 9.240
16. Water storage18.480 to 49.2800.185 to 0.986
17. Water filtration30.800 to 154.0001.232 to 12.320
18. Orchard11.550 to 30.8000.462 to 2.464
19. Greenhouse57.750 to 192.5001.155 to 7.700
20. Vegetable gardens27.720 to 83.1601.109 to 6.653
21. Chicken coop23.100 to 64.6800.462 to 2.587
22. Chicken tunnels and runs30.800 to 86.2400.616 to 3.450
23. Central island and planted grounds34.650 to 115.5001.386 to 9.240

BUILD ENVELOPE ARS M 8,986.693 to 23,181.312 ANNUAL FUND ARS M 646.192 to 1,628.381

Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres · m² square metre, an area unit

m (currency) million, 1,000,000 of the stated currency · k (currency) thousand, 1,000 of the stated currency

ARS Argentine peso

ARS Argentine peso · CC0 Creative Commons Zero, a public-domain dedication tool