Lakeside Mixed-Use Estate
Complete supplied estate concept. Labels are transcribed in the numbered key that follows. This image does not document a surveyed or built site.
Numbered concept key
| No. | Feature | Basis |
|---|---|---|
| 1 | Entrance gate | Visible form |
| 2 | Security center | Labelled |
| 3 | Vehicle parking | Labelled |
| 4 | Internal service roads | Visible form |
| 5 | Boundary fence | Visible form |
| 6 | Compost and storage | Labelled |
| 7 | Tractor garage | Labelled |
| 8 | Machine shop | Labelled |
| 9 | Solar panels | Labelled |
| 10 | Battery storage | Labelled |
| 11 | Sheep barn label | Labelled |
| 12 | Chicken coop | Labelled |
| 13 | Apple orchard label | Labelled |
| 14 | Vegetable gardens | Labelled |
| 15 | Greenhouse village | Labelled |
| 16 | Horse barn | Labelled |
| 17 | Horse pasture | Labelled |
| 18 | Family homes | Labelled |
| 19 | Main house | Labelled |
| 20 | Visible pool group | Visible form |
| 21 | Private lake label | Labelled |
| 22 | Fish pond | Labelled |
| 23 | Stream, cascade and crossing | Visible form |
| 24 | Fire pit and outdoor pavilion | Labelled |
| 25 | Docks and waterside decks | Visible form |
| 26 | Paths and planted grounds | Visible form |
Lakeside Mixed-Use Estate: Components
Items 1-9 of 26 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 1. Entrance gate Method M1 Allow livestock trailers and emergency access without crossing visitor queues. | 1 set | $20.0k-60.0k | $400-2.4k |
| 2. Security center Method M1 Include staff welfare and communications in the arrival brief. | 60 m² | $90.0k-180.0k | $900-3.6k |
| 3. Vehicle parking Method M2 Keep parking runoff outside the water-treatment catchment. | 700 m² | $56.0k-112.0k | $560-2.8k |
| 4. Internal service roads Method M2 Separate heavy deliveries from shoreline walks. | 5500 m² | $440.0k-880.0k | $4.4k-22.0k |
| 5. Boundary fence Method M1 Confirm the cadastral boundary and wildlife movement constraints. | 1600 m | $320.0k-960.0k | $1.6k-14.4k |
| 6. Compost and storage Method M9 Contain leachate and retain all-weather collection access. | 1 set | $10.0k-35.0k | $400-2.8k |
| 7. Tractor garage Method M4 Provide maintainable doors and an attachment storage zone. | 250 m² | $225.0k-450.0k | $2.2k-11.2k |
| 8. Machine shop Method M4 Separate sparks, welding and oils from livestock bedding. | 300 m² | $270.0k-540.0k | $2.7k-13.5k |
| 9. Solar panels Method M7 Model a capacity, not the decorative panel count. | 120 kWdc | $240.0k-420.0k | $2.4k-8.4k |
Items 10-18 of 26 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 10. Battery storage Method M7 Locate for fire-service access and the actual manufacturer clearances. | 240 kWh | $144.0k-240.0k | $1.4k-6.0k |
| 11. Sheep barn label Method M5 The label supplies intended use; stocking and ventilation remain to be designed. | 250 m² | $150.0k-375.0k | $2.2k-11.2k |
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m metre, a length unit
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · kWh kilowatt-hour, energy · m² square metre, an area unit · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency