Feature, method and purposeAssumed quantityBuild USDCare/year USD
12. Chicken coop Method M5 Keep poultry handling separate from food wash and packing.100 m²$25.0k-70.0k$500-2.8k
13. Apple orchard label Method M6 Confirm the crop locally; the image does not verify a cultivar.1 ha$15.0k-40.0k$600-3.2k
14. Vegetable gardens Method M6 Meter irrigation and provide non-slip harvest routes.2000 m²$40.0k-120.0k$1.6k-9.6k
15. Greenhouse village Method M6 Divide crop zones to make isolation and maintenance practical.1000 m²$150.0k-500.0k$3.0k-20.0k
16. Horse barn Method M5 Separate tack, feed and manure flows.500 m²$300.0k-750.0k$4.5k-22.5k
17. Horse pasture Method M5 The assumed area is not a stocking recommendation.2 ha$16.0k-40.0k$640-3.2k
18. Family homes Method M3 Budget four 400 m2 homes as a scenario, with individual utility isolation.1600 m²$4.00m-8.00m$40.0k-160.0k
19. Main house Method M3 Define guest capacity and domestic service space before sizing utilities.1000 m²$2.50m-5.00m$25.0k-100.0k
20. Visible pool group Method M11 Four pools are a budget assumption, not a verified asset count.4 set$240.0k-600.0k$7.2k-36.0k
21. Private lake label Method M12 Ownership, shoreline rights and existing water-body condition are unknown.UnresolvedUnpricedUnpriced
22. Fish pond Method M12 Fish species and stocking are not verified; investigate inflow and overflow first.1 set$60.0k-250.0k$900-10.0k
23. Stream, cascade and crossing Method M14 Hydrology and structural design are unpriced specialist work.UnresolvedUnpricedUnpriced
24. Fire pit and outdoor pavilion Method M12 Do not assume open fires are permitted; evaluate embers and exits.80 m²$80.0k-200.0k$800-6.0k
Feature, method and purposeAssumed quantityBuild USDCare/year USD
25. Docks and waterside decks Method M12 Design for water levels, flotation or piles, and local consent.100 m²$70.0k-180.0k$1.4k-7.2k
26. Paths and planted grounds Method M15 Keep walkways separated from paddock gates and service traffic.4 ha$60.0k-200.0k$2.4k-16.0k

Lakeside mixed-use estate: cost and operation

Construction scenario

Visible feature allowances $9.52m-20.20m

Proposed missing services $236.0k-906.0k

Priced works subtotal $9.76m-21.11m

Professional / permit allowance $1.17m-4.22m

Contingency on priced works $2.44m-8.44m

Scenario envelope, exclusions apply $13.37m-33.77m

Annual operating provision

Asset care and minor repairs $112.6k-531.1k

Staff: assumed 12 full-time equivalents $600.0k-1.08m

Utilities and operating energy $60.0k-180.0k

Renewal reserve, set aside $97.6k-422.2k

Funded annual subtotal $870.1k-2.21m

Water, animals and guests share the slope

The lake, stream and pond create attractive views but also drainage and access constraints. Keep nutrient runoff and manure away from water. Do not assume the waterfall is a sustainable energy or water source.

Day and night responsibilities

Open prices: Private lake label, Stream, cascade and crossing

Lakeside Mixed-Use Estate: Argentine Pesos

Retained scenario conversion

Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · kWh kilowatt-hour, energy · m² square metre, an area unit · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency

k (currency) thousand, 1,000 of the stated currency · m (currency) million, 1,000,000 of the stated currency · ARS Argentine peso