Read the scene and its key together

Long Lakeside Service Estate: Components

Items 1-9 of 30 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
1. Entrance gate Method M1 Confirm the only apparent access route can serve emergency vehicles.1 set$20.0k-60.0k$400-2.4k
2. Main access spine Method M2 Keep the long central route clear of deliveries and recreational parking.6500 m²$520.0k-1.04m$5.2k-26.0k
3. Boundary fencing Method M1 Confirm which shoreline and inland boundaries are actually owned.1600 m$320.0k-960.0k$1.6k-14.4k
4. Main lodge Method M3 Separate family rooms, guest reception and kitchen deliveries.1000 m²$2.50m-5.00m$25.0k-100.0k
5. Parents' house Method M3 Provide an accessible path to the shared core.300 m²$750.0k-1.50m$7.5k-30.0k
6. Grandparents' house Method M3 Review slopes and emergency access before adopting the concept terraces.300 m²$750.0k-1.50m$7.5k-30.0k
7. Brother's house Method M3 Assign a service isolation point and housekeeping route.300 m²$750.0k-1.50m$7.5k-30.0k
8. Sister's house Method M3 Protect dwelling entrances from road runoff.300 m²$750.0k-1.50m$7.5k-30.0k
9. Guest house Method M3 Confirm occupancy and laundry demand.300 m²$750.0k-1.50m$7.5k-30.0k

Items 10-18 of 30 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
10. Upper lake-view cabin Method M3 The two cabin labels are separate accommodation packages.150 m²$375.0k-750.0k$3.8k-15.0k
11. Lower lake-view cabin Method M3 Check shore setbacks and independent evacuation access.150 m²$375.0k-750.0k$3.8k-15.0k
12. Tennis court Method M11 Confirm drainage, fencing and lighting spill before surface selection.1 set$60.0k-150.0k$1.2k-6.0k
13. Children's recreation area Method M11 Provide age-appropriate equipment and a separate supervision plan.1 set$25.0k-90.0k$500-3.6k
14. Shared recreation pool Method M11 The pool is costed separately from play equipment.1 set$60.0k-150.0k$1.8k-9.0k
15. Dwelling pools Method M11 Five additional pool packages are an explicit scenario allowance.5 set$300.0k-750.0k$9.0k-45.0k
16. Vegetable gardens Method M6 Separate irrigation from the domestic supply with approved protection.1800 m²$36.0k-108.0k$1.4k-8.6k
17. Greenhouses Method M6 Reserve service access between structures.500 m²$75.0k-250.0k$1.5k-10.0k
18. Horse pasture Method M5 No carrying capacity can be read from animal silhouettes.3 ha$24.0k-60.0k$960-4.8k

Items 19-27 of 30 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
19. Cattle pasture Method M5 Use a forage and stocking plan before fencing divisions.5 ha$40.0k-100.0k$1.6k-8.0k
20. Barn and stables Method M5 Separate species, feed handling and manure removal.600 m²$360.0k-900.0k$5.4k-27.0k
Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · m metre, a length unit

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · m metre, a length unit · ha hectare, 10,000 square metres

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · ha hectare, 10,000 square metres · m² square metre, an area unit