Items 10-18 of 30 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 10. Upper lake-view cabin Method M3 The two cabin labels are separate accommodation packages. | 150 m² | $375.0k-750.0k | $3.8k-15.0k |
| 11. Lower lake-view cabin Method M3 Check shore setbacks and independent evacuation access. | 150 m² | $375.0k-750.0k | $3.8k-15.0k |
| 12. Tennis court Method M11 Confirm drainage, fencing and lighting spill before surface selection. | 1 set | $60.0k-150.0k | $1.2k-6.0k |
| 13. Children's recreation area Method M11 Provide age-appropriate equipment and a separate supervision plan. | 1 set | $25.0k-90.0k | $500-3.6k |
| 14. Shared recreation pool Method M11 The pool is costed separately from play equipment. | 1 set | $60.0k-150.0k | $1.8k-9.0k |
| 15. Dwelling pools Method M11 Five additional pool packages are an explicit scenario allowance. | 5 set | $300.0k-750.0k | $9.0k-45.0k |
| 16. Vegetable gardens Method M6 Separate irrigation from the domestic supply with approved protection. | 1800 m² | $36.0k-108.0k | $1.4k-8.6k |
| 17. Greenhouses Method M6 Reserve service access between structures. | 500 m² | $75.0k-250.0k | $1.5k-10.0k |
| 18. Horse pasture Method M5 No carrying capacity can be read from animal silhouettes. | 3 ha | $24.0k-60.0k | $960-4.8k |
Items 19-27 of 30 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 19. Cattle pasture Method M5 Use a forage and stocking plan before fencing divisions. | 5 ha | $40.0k-100.0k | $1.6k-8.0k |
| 20. Barn and stables Method M5 Separate species, feed handling and manure removal. | 600 m² | $360.0k-900.0k | $5.4k-27.0k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 21. Fishing pond Method M12 Confirm water quality and permitted use before stocking. | 1 set | $60.0k-250.0k | $900-10.0k |
| 22. Tractor garage Method M4 Include room for attachments and safe maintenance. | 200 m² | $180.0k-360.0k | $1.8k-9.0k |
| 23. Equipment storage Method M4 Identify loads and shelving before choosing the slab. | 150 m² | $135.0k-270.0k | $1.4k-6.8k |
| 24. Maintenance garage Method M4 Provide oil containment and waste collection. | 250 m² | $225.0k-450.0k | $2.2k-11.2k |
| 25. Chicken coop Method M5 Keep poultry waste out of recreation and shoreline drainage. | 100 m² | $25.0k-70.0k | $500-2.8k |
| 26. Boat house Method M12 Marine foundations and shore consents require separate design. | 180 m² | $252.0k-540.0k | $3.8k-16.2k |
| 27. Boat berths and docks Method M12 Boats themselves are excluded pending an asset choice. | 120 m² | $84.0k-216.0k | $1.7k-8.6k |
| 28. Lake and shoreline Method M12 No land title, water rights or shore works price is established. | Unresolved | Unpriced | Unpriced |
| 29. Formal fountain court Method M11 Provide recirculation, cleaning access and slip-resistant edges. | 1 set | $10.0k-40.0k | $300-2.4k |
| 30. Grounds and garden paths Method M15 Budget regular drainage and tree inspections. | 4 ha | $60.0k-200.0k | $2.4k-16.0k |
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · m metre, a length unit · ha hectare, 10,000 square metres
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · ha hectare, 10,000 square metres · m² square metre, an area unit