Terraced Landscape Estate
Complete supplied estate concept. Labels are transcribed in the numbered key that follows. This image does not document a surveyed or built site.
Numbered concept key
| No. | Feature | Basis |
|---|---|---|
| 1 | Estate entrance | Labelled |
| 2 | Perimeter enclosure | Visible form |
| 3 | Circulation road | Visible form |
| 4 | Garage | Labelled |
| 5 | Workshop | Labelled |
| 6 | Trash system | Labelled |
| 7 | Septic system | Labelled |
| 8 | Water recycling | Labelled |
| 9 | Solar parking structure | Labelled |
| 10 | Carport canopy | Visible form |
| 11 | Orchard | Labelled |
| 12 | Organic gardens label | Labelled |
| 13 | Greenhouse | Visible form |
| 14 | Private lake label | Labelled |
| 15 | Dock and lakeside pavilion | Visible form |
| 16 | Main residence | Labelled |
| 17 | Grandparents' house | Labelled |
| 18 | Parents' house | Labelled |
| 19 | Guest villa | Labelled |
| 20 | Residential pools | Visible form |
| 21 | Terraced landscaping and paths | Visible form |
Terraced Landscape Estate: Components
Items 1-9 of 21 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 1. Estate entrance Method M1 Provide manual release and unblocked emergency arrival. | 1 set | $20.0k-60.0k | $400-2.4k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 2. Perimeter enclosure Method M1 Retain overland drainage paths through the enclosure. | 1400 m | $280.0k-840.0k | $1.4k-12.6k |
| 3. Circulation road Method M2 Confirm grades and downhill braking before paving. | 5000 m² | $400.0k-800.0k | $4.0k-20.0k |
| 4. Garage Method M4 Separate vehicle storage from workshop processes. | 250 m² | $225.0k-450.0k | $2.2k-11.2k |
| 5. Workshop Method M4 Reserve equipment replacement access and dust extraction. | 250 m² | $225.0k-450.0k | $2.2k-11.2k |
| 6. Trash system Method M9 Use contained, segregated bins and collection access. | 1 set | $10.0k-35.0k | $400-2.8k |
| 7. Septic system Method M9 The drawing does not show a verified drainfield or reserve area. | 1 set | $20.0k-100.0k | $400-4.0k |
| 8. Water recycling Method M8 Treat reuse water to the intended use; never assume it is drinkable. | 1 set | $20.0k-100.0k | $800-8.0k |
| 9. Solar parking structure Method M7 PV allowance excludes the supporting canopy, which is item 10. | 100 kWdc | $200.0k-350.0k | $2.0k-7.0k |
| 10. Carport canopy Method M4 Avoid double-counting the PV equipment; size the canopy independently. | 350 m² | $315.0k-630.0k | $3.1k-15.8k |
| 11. Orchard Method M6 Confirm crop suitability and maintenance access. | 0.8 ha | $12.0k-32.0k | $480-2.6k |
| 12. Organic gardens label Method M6 Organic certification and crop identity are not verified by the label. | 1500 m² | $30.0k-90.0k | $1.2k-7.2k |
| 13. Greenhouse Method M6 Include roof runoff and controllable ventilation. | 300 m² | $45.0k-150.0k | $900-6.0k |
| 14. Private lake label Method M12 Ownership and water rights are unverified; exclude acquisition from priced works. | Unresolved | Unpriced | Unpriced |
| 15. Dock and lakeside pavilion Method M12 Check seasonal water levels and safe access. | 80 m² | $56.0k-144.0k | $1.1k-5.8k |
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · PV Photovoltaic · m metre, a length unit · m² square metre, an area unit · ha hectare, 10,000 square metres
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · PV Photovoltaic · m metre, a length unit · m² square metre, an area unit · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency
