| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 2. Perimeter enclosure Method M1 Retain overland drainage paths through the enclosure. | 1400 m | $280.0k-840.0k | $1.4k-12.6k |
| 3. Circulation road Method M2 Confirm grades and downhill braking before paving. | 5000 m² | $400.0k-800.0k | $4.0k-20.0k |
| 4. Garage Method M4 Separate vehicle storage from workshop processes. | 250 m² | $225.0k-450.0k | $2.2k-11.2k |
| 5. Workshop Method M4 Reserve equipment replacement access and dust extraction. | 250 m² | $225.0k-450.0k | $2.2k-11.2k |
| 6. Trash system Method M9 Use contained, segregated bins and collection access. | 1 set | $10.0k-35.0k | $400-2.8k |
| 7. Septic system Method M9 The drawing does not show a verified drainfield or reserve area. | 1 set | $20.0k-100.0k | $400-4.0k |
| 8. Water recycling Method M8 Treat reuse water to the intended use; never assume it is drinkable. | 1 set | $20.0k-100.0k | $800-8.0k |
| 9. Solar parking structure Method M7 PV allowance excludes the supporting canopy, which is item 10. | 100 kWdc | $200.0k-350.0k | $2.0k-7.0k |
| 10. Carport canopy Method M4 Avoid double-counting the PV equipment; size the canopy independently. | 350 m² | $315.0k-630.0k | $3.1k-15.8k |
| 11. Orchard Method M6 Confirm crop suitability and maintenance access. | 0.8 ha | $12.0k-32.0k | $480-2.6k |
| 12. Organic gardens label Method M6 Organic certification and crop identity are not verified by the label. | 1500 m² | $30.0k-90.0k | $1.2k-7.2k |
| 13. Greenhouse Method M6 Include roof runoff and controllable ventilation. | 300 m² | $45.0k-150.0k | $900-6.0k |
| 14. Private lake label Method M12 Ownership and water rights are unverified; exclude acquisition from priced works. | Unresolved | Unpriced | Unpriced |
| 15. Dock and lakeside pavilion Method M12 Check seasonal water levels and safe access. | 80 m² | $56.0k-144.0k | $1.1k-5.8k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 16. Main residence Method M3 Confirm floor area and service rooms before cost refinement. | 900 m² | $2.25m-4.50m | $22.5k-90.0k |
| 17. Grandparents' house Method M3 Use an accessible route that does not depend on decorative steps. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 18. Parents' house Method M3 Keep service access clear of private gardens. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 19. Guest villa Method M3 Define guest turnover and laundry demand. | 300 m² | $750.0k-1.50m | $7.5k-30.0k |
| 20. Residential pools Method M11 Four pool packages are assumed for the cost comparison. | 4 set | $240.0k-600.0k | $7.2k-36.0k |
| 21. Terraced landscaping and paths Method M15 Retaining structures are not priced until a level survey establishes them. | 3 ha | $45.0k-150.0k | $1.8k-12.0k |
Terraced landscape estate: cost and operation
Construction scenario
Visible feature allowances $6.89m-14.48m
Proposed missing services $196.0k-706.0k
Priced works subtotal $7.09m-15.19m
Professional / permit allowance $850.7k-3.04m
Contingency on priced works $1.77m-6.07m
Scenario envelope, exclusions apply $9.71m-24.30m
Annual operating provision
Asset care and minor repairs $81.2k-382.8k
Staff: assumed 9 full-time equivalents $450.0k-810.0k
Utilities and operating energy $45.0k-135.0k
Renewal reserve, set aside $70.9k-303.7k
Funded annual subtotal $647.1k-1.63m
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · PV Photovoltaic · m metre, a length unit · m² square metre, an area unit · ha hectare, 10,000 square metres
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · PV Photovoltaic · m metre, a length unit · m² square metre, an area unit · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency
k (currency) thousand, 1,000 of the stated currency · m (currency) million, 1,000,000 of the stated currency · USD United States dollar · ARS Argentine peso
