Items 1-9 of 26 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
1. Main gate Method M1 Provide emergency entry independent of powered access control.1 set$20.0k-60.0k$400-2.4k
2. Security center Method M1 Separate arriving visitors from service vehicles and helipad operations.60 m²$90.0k-180.0k$900-3.6k
3. Internal drive and paved yard Method M2 Vehicle circulation must not enter any future rotor safety area.4200 m²$336.0k-672.0k$3.4k-16.8k
4. Perimeter and shoreline boundary Method M1 Visible shore edges do not prove ownership or a buildable setback.1200 m$240.0k-720.0k$1.2k-10.8k
5. Main house Method M3 Confirm guest capacity and mechanical rooms.700 m²$1.75m-3.50m$17.5k-70.0k
6. Parents' house Method M3 Provide a step-free family connection where required.300 m²$750.0k-1.50m$7.5k-30.0k
7. Grandparents' house Method M3 Keep accommodation access separate from the dock service route.300 m²$750.0k-1.50m$7.5k-30.0k
8. Guest house Method M3 Define water, waste and housekeeping loads.300 m²$750.0k-1.50m$7.5k-30.0k
9. Unlabelled residence A Method M3 Residential appearance only; actual use and area are not established.300 m²$750.0k-1.50m$7.5k-30.0k

Items 10-18 of 26 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
10. Unlabelled residence B Method M3 Do not invent an occupant or household attribution.300 m²$750.0k-1.50m$7.5k-30.0k
11. Unlabelled residence C Method M3 Treat this as a separate assumed accommodation allowance.350 m²$875.0k-1.75m$8.8k-35.0k
Feature, method and purposeAssumed quantityBuild USDCare/year USD
12. Unlabelled residence D Method M3 Confirm its use before procuring finishes or utilities.350 m²$875.0k-1.75m$8.8k-35.0k
13. Gardens Method M6 Provide wash and harvest access without crossing the landing area.1200 m²$24.0k-72.0k$960-5.8k
14. Greenhouse complex Method M6 Check sun access and storm exposure at the shore.600 m²$90.0k-300.0k$1.8k-12.0k
15. Orchard Method M6 Species and rootstock remain undecided.0.8 ha$12.0k-32.0k$480-2.6k
16. Solar farm Method M7 Model capacity independently of illustrated panel count.100 kWdc$200.0k-350.0k$2.0k-7.0k
17. Battery storage Method M7 Provide isolation, ventilation requirements and emergency access.200 kWh$120.0k-200.0k$1.2k-5.0k
18. Machine shop Method M4 Separate chemicals and hot work from the battery equipment.350 m²$315.0k-630.0k$3.1k-15.8k
19. Tractor garage Method M4 Keep vehicle doors clear of helicopter operations.200 m²$180.0k-360.0k$1.8k-9.0k
20. Helicopter landing marking Method M13 A painted H does not establish a usable or approved heliport.1 set$100.0k-400.0k$1.0k-10.0k
21. Depicted helicopter Method M13 Purchase, crew, maintenance and flight costs require an aircraft-specific quote.UnresolvedUnpricedUnpriced
22. Boat house Method M12 Marine works and water-level loads need specialist design.150 m²$210.0k-450.0k$3.1k-13.5k
23. Private dock label Method M12 Dock use rights and craft sizes are not established.160 m²$112.0k-288.0k$2.2k-11.5k
24. Bridge or causeway Method M14 Its span, ownership and structural system are unverified and unpriced.UnresolvedUnpricedUnpriced
Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m metre, a length unit · m (currency) million, 1,000,000 of the stated currency

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres · kWh kilowatt-hour, energy