| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 12. Unlabelled residence D Method M3 Confirm its use before procuring finishes or utilities. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 13. Gardens Method M6 Provide wash and harvest access without crossing the landing area. | 1200 m² | $24.0k-72.0k | $960-5.8k |
| 14. Greenhouse complex Method M6 Check sun access and storm exposure at the shore. | 600 m² | $90.0k-300.0k | $1.8k-12.0k |
| 15. Orchard Method M6 Species and rootstock remain undecided. | 0.8 ha | $12.0k-32.0k | $480-2.6k |
| 16. Solar farm Method M7 Model capacity independently of illustrated panel count. | 100 kWdc | $200.0k-350.0k | $2.0k-7.0k |
| 17. Battery storage Method M7 Provide isolation, ventilation requirements and emergency access. | 200 kWh | $120.0k-200.0k | $1.2k-5.0k |
| 18. Machine shop Method M4 Separate chemicals and hot work from the battery equipment. | 350 m² | $315.0k-630.0k | $3.1k-15.8k |
| 19. Tractor garage Method M4 Keep vehicle doors clear of helicopter operations. | 200 m² | $180.0k-360.0k | $1.8k-9.0k |
| 20. Helicopter landing marking Method M13 A painted H does not establish a usable or approved heliport. | 1 set | $100.0k-400.0k | $1.0k-10.0k |
| 21. Depicted helicopter Method M13 Purchase, crew, maintenance and flight costs require an aircraft-specific quote. | Unresolved | Unpriced | Unpriced |
| 22. Boat house Method M12 Marine works and water-level loads need specialist design. | 150 m² | $210.0k-450.0k | $3.1k-13.5k |
| 23. Private dock label Method M12 Dock use rights and craft sizes are not established. | 160 m² | $112.0k-288.0k | $2.2k-11.5k |
| 24. Bridge or causeway Method M14 Its span, ownership and structural system are unverified and unpriced. | Unresolved | Unpriced | Unpriced |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 25. Lake and shore Method M12 This concept does not prove an island, a title boundary or potable water. | Unresolved | Unpriced | Unpriced |
| 26. Planted grounds and paths Method M15 Keep drainage outfalls from eroding the shoreline. | 2.5 ha | $37.5k-125.0k | $1.5k-10.0k |
Waterfront and garden compound: cost and operation
Construction scenario
Visible feature allowances $9.34m-19.34m
Proposed missing services $236.0k-906.0k
Priced works subtotal $9.57m-20.25m
Professional / permit allowance $1.15m-4.05m
Contingency on priced works $2.39m-8.10m
Scenario envelope, exclusions apply $13.11m-32.39m
Annual operating provision
Asset care and minor repairs $102.4k-461.9k
Staff: assumed 11 full-time equivalents $550.0k-990.0k
Utilities and operating energy $55.0k-165.0k
Renewal reserve, set aside $95.7k-404.9k
Funded annual subtotal $803.1k-2.02m
A waterfront estate is not yet an aviation site
Treat the helipad marking and bridge as unresolved specialist interfaces. Maintain a usable pedestrian and service network without relying on either facility being approved.
Day and night responsibilities
Open prices: Depicted helicopter, Bridge or causeway, Lake and shore
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres · kWh kilowatt-hour, energy
ARS Argentine peso
