Dock And Pavilion Estate

Complete supplied estate concept. Labels are transcribed in the numbered key that follows. This image does not document a surveyed or built site.

Numbered concept key

No.FeatureBasis
1Entrance gateVisible form
2Boundary enclosureVisible form
3Access drive and forecourtsVisible form
4GarageLabelled
5BarnLabelled
6Chicken coop and runLabelled
7Trash systemLabelled
8Septic systemLabelled
9Water treatmentLabelled
10Battery storageLabelled
11Solar arrayLabelled
12OrchardLabelled
13Vegetable gardensLabelled
14GreenhouseLabelled
15Main residenceLabelled
16Family villasLabelled
17Guest lodgeLabelled
18Swimming poolLabelled
19Lakeside pavilionLabelled
20Private dock labelLabelled
21LakeVisible form
22Courts, paths and groundsVisible form

Dock And Pavilion Estate: Components

Items 1-9 of 22 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
1. Entrance gate Method M1 Maintain manual release and a clear emergency approach.1 set$20.0k-60.0k$400-2.4k
Feature, method and purposeAssumed quantityBuild USDCare/year USD
2. Boundary enclosure Method M1 Confirm the cadastral boundary independently of the drawing.1100 m$220.0k-660.0k$1.1k-9.9k
3. Access drive and forecourts Method M2 Keep delivery turning outside family walking routes.4000 m²$320.0k-640.0k$3.2k-16.0k
4. Garage Method M4 List the actual vehicle sizes and service tasks.300 m²$270.0k-540.0k$2.7k-13.5k
5. Barn Method M5 Keep bedding and feed dry and separate from electrical equipment.250 m²$150.0k-375.0k$2.2k-11.2k
6. Chicken coop and run Method M5 The repeated chicken label points to the same operating zone.100 m²$25.0k-70.0k$500-2.8k
7. Trash system Method M9 Keep collections accessible without driving on wastewater disposal areas.1 set$10.0k-35.0k$400-2.8k
8. Septic system Method M9 The apparent garden beside it is not permission to plant over a drainfield.1 set$20.0k-100.0k$400-4.0k
9. Water treatment Method M8 Specify a treatment train only after source-water testing.1 set$20.0k-100.0k$800-8.0k
10. Battery storage Method M7 Keep cabinets accessible and protected from flooding.120 kWh$72.0k-120.0k$720-3.0k
11. Solar array Method M7 Provide a verified electrical design and performance model.60 kWdc$120.0k-210.0k$1.2k-4.2k
12. Orchard Method M6 No individual species is established by the image.0.6 ha$9.0k-24.0k$360-1.9k
13. Vegetable gardens Method M6 Avoid wastewater disposal areas and reserve irrigation access.1000 m²$20.0k-60.0k$800-4.8k
14. Greenhouse Method M6 Provide service access at both ends of the growing space.300 m²$45.0k-150.0k$900-6.0k
Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres