Dock And Pavilion Estate
Complete supplied estate concept. Labels are transcribed in the numbered key that follows. This image does not document a surveyed or built site.
Numbered concept key
| No. | Feature | Basis |
|---|---|---|
| 1 | Entrance gate | Visible form |
| 2 | Boundary enclosure | Visible form |
| 3 | Access drive and forecourts | Visible form |
| 4 | Garage | Labelled |
| 5 | Barn | Labelled |
| 6 | Chicken coop and run | Labelled |
| 7 | Trash system | Labelled |
| 8 | Septic system | Labelled |
| 9 | Water treatment | Labelled |
| 10 | Battery storage | Labelled |
| 11 | Solar array | Labelled |
| 12 | Orchard | Labelled |
| 13 | Vegetable gardens | Labelled |
| 14 | Greenhouse | Labelled |
| 15 | Main residence | Labelled |
| 16 | Family villas | Labelled |
| 17 | Guest lodge | Labelled |
| 18 | Swimming pool | Labelled |
| 19 | Lakeside pavilion | Labelled |
| 20 | Private dock label | Labelled |
| 21 | Lake | Visible form |
| 22 | Courts, paths and grounds | Visible form |
Dock And Pavilion Estate: Components
Items 1-9 of 22 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 1. Entrance gate Method M1 Maintain manual release and a clear emergency approach. | 1 set | $20.0k-60.0k | $400-2.4k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 2. Boundary enclosure Method M1 Confirm the cadastral boundary independently of the drawing. | 1100 m | $220.0k-660.0k | $1.1k-9.9k |
| 3. Access drive and forecourts Method M2 Keep delivery turning outside family walking routes. | 4000 m² | $320.0k-640.0k | $3.2k-16.0k |
| 4. Garage Method M4 List the actual vehicle sizes and service tasks. | 300 m² | $270.0k-540.0k | $2.7k-13.5k |
| 5. Barn Method M5 Keep bedding and feed dry and separate from electrical equipment. | 250 m² | $150.0k-375.0k | $2.2k-11.2k |
| 6. Chicken coop and run Method M5 The repeated chicken label points to the same operating zone. | 100 m² | $25.0k-70.0k | $500-2.8k |
| 7. Trash system Method M9 Keep collections accessible without driving on wastewater disposal areas. | 1 set | $10.0k-35.0k | $400-2.8k |
| 8. Septic system Method M9 The apparent garden beside it is not permission to plant over a drainfield. | 1 set | $20.0k-100.0k | $400-4.0k |
| 9. Water treatment Method M8 Specify a treatment train only after source-water testing. | 1 set | $20.0k-100.0k | $800-8.0k |
| 10. Battery storage Method M7 Keep cabinets accessible and protected from flooding. | 120 kWh | $72.0k-120.0k | $720-3.0k |
| 11. Solar array Method M7 Provide a verified electrical design and performance model. | 60 kWdc | $120.0k-210.0k | $1.2k-4.2k |
| 12. Orchard Method M6 No individual species is established by the image. | 0.6 ha | $9.0k-24.0k | $360-1.9k |
| 13. Vegetable gardens Method M6 Avoid wastewater disposal areas and reserve irrigation access. | 1000 m² | $20.0k-60.0k | $800-4.8k |
| 14. Greenhouse Method M6 Provide service access at both ends of the growing space. | 300 m² | $45.0k-150.0k | $900-6.0k |
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency