| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 2. Boundary enclosure Method M1 Confirm the cadastral boundary independently of the drawing. | 1100 m | $220.0k-660.0k | $1.1k-9.9k |
| 3. Access drive and forecourts Method M2 Keep delivery turning outside family walking routes. | 4000 m² | $320.0k-640.0k | $3.2k-16.0k |
| 4. Garage Method M4 List the actual vehicle sizes and service tasks. | 300 m² | $270.0k-540.0k | $2.7k-13.5k |
| 5. Barn Method M5 Keep bedding and feed dry and separate from electrical equipment. | 250 m² | $150.0k-375.0k | $2.2k-11.2k |
| 6. Chicken coop and run Method M5 The repeated chicken label points to the same operating zone. | 100 m² | $25.0k-70.0k | $500-2.8k |
| 7. Trash system Method M9 Keep collections accessible without driving on wastewater disposal areas. | 1 set | $10.0k-35.0k | $400-2.8k |
| 8. Septic system Method M9 The apparent garden beside it is not permission to plant over a drainfield. | 1 set | $20.0k-100.0k | $400-4.0k |
| 9. Water treatment Method M8 Specify a treatment train only after source-water testing. | 1 set | $20.0k-100.0k | $800-8.0k |
| 10. Battery storage Method M7 Keep cabinets accessible and protected from flooding. | 120 kWh | $72.0k-120.0k | $720-3.0k |
| 11. Solar array Method M7 Provide a verified electrical design and performance model. | 60 kWdc | $120.0k-210.0k | $1.2k-4.2k |
| 12. Orchard Method M6 No individual species is established by the image. | 0.6 ha | $9.0k-24.0k | $360-1.9k |
| 13. Vegetable gardens Method M6 Avoid wastewater disposal areas and reserve irrigation access. | 1000 m² | $20.0k-60.0k | $800-4.8k |
| 14. Greenhouse Method M6 Provide service access at both ends of the growing space. | 300 m² | $45.0k-150.0k | $900-6.0k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 15. Main residence Method M3 Define occupancy and room areas before structural design. | 900 m² | $2.25m-4.50m | $22.5k-90.0k |
| 16. Family villas Method M3 Budget two 350 m2 villas as an explicit scenario. | 700 m² | $1.75m-3.50m | $17.5k-70.0k |
| 17. Guest lodge Method M3 Check its shoreline setback and emergency approach. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 18. Swimming pool Method M11 Provide barriers, disinfection and separate pool drainage. | 1 set | $60.0k-150.0k | $1.8k-9.0k |
| 19. Lakeside pavilion Method M12 Check wind exposure and public access restrictions. | 100 m² | $100.0k-250.0k | $1.0k-7.5k |
| 20. Private dock label Method M12 A private label does not establish rights to use the lakebed. | 100 m² | $70.0k-180.0k | $1.4k-7.2k |
| 21. Lake Method M12 Acquisition, shoreline works and water rights are unpriced. | Unresolved | Unpriced | Unpriced |
| 22. Courts, paths and grounds Method M15 Maintain sightlines and tree access around the lodge. | 3 ha | $45.0k-150.0k | $1.8k-12.0k |
Dock and pavilion estate: cost and operation
Construction scenario
Visible feature allowances $6.47m-13.62m
Proposed missing services $196.0k-706.0k
Priced works subtotal $6.67m-14.33m
Professional / permit allowance $800.0k-2.87m
Contingency on priced works $1.67m-5.73m
Scenario envelope, exclusions apply $9.13m-22.93m
Annual operating provision
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency
k (currency) thousand, 1,000 of the stated currency · m (currency) million, 1,000,000 of the stated currency · ARS Argentine peso