Feature, method and purposeAssumed quantityBuild USDCare/year USD
2. Boundary enclosure Method M1 Confirm the cadastral boundary independently of the drawing.1100 m$220.0k-660.0k$1.1k-9.9k
3. Access drive and forecourts Method M2 Keep delivery turning outside family walking routes.4000 m²$320.0k-640.0k$3.2k-16.0k
4. Garage Method M4 List the actual vehicle sizes and service tasks.300 m²$270.0k-540.0k$2.7k-13.5k
5. Barn Method M5 Keep bedding and feed dry and separate from electrical equipment.250 m²$150.0k-375.0k$2.2k-11.2k
6. Chicken coop and run Method M5 The repeated chicken label points to the same operating zone.100 m²$25.0k-70.0k$500-2.8k
7. Trash system Method M9 Keep collections accessible without driving on wastewater disposal areas.1 set$10.0k-35.0k$400-2.8k
8. Septic system Method M9 The apparent garden beside it is not permission to plant over a drainfield.1 set$20.0k-100.0k$400-4.0k
9. Water treatment Method M8 Specify a treatment train only after source-water testing.1 set$20.0k-100.0k$800-8.0k
10. Battery storage Method M7 Keep cabinets accessible and protected from flooding.120 kWh$72.0k-120.0k$720-3.0k
11. Solar array Method M7 Provide a verified electrical design and performance model.60 kWdc$120.0k-210.0k$1.2k-4.2k
12. Orchard Method M6 No individual species is established by the image.0.6 ha$9.0k-24.0k$360-1.9k
13. Vegetable gardens Method M6 Avoid wastewater disposal areas and reserve irrigation access.1000 m²$20.0k-60.0k$800-4.8k
14. Greenhouse Method M6 Provide service access at both ends of the growing space.300 m²$45.0k-150.0k$900-6.0k
Feature, method and purposeAssumed quantityBuild USDCare/year USD
15. Main residence Method M3 Define occupancy and room areas before structural design.900 m²$2.25m-4.50m$22.5k-90.0k
16. Family villas Method M3 Budget two 350 m2 villas as an explicit scenario.700 m²$1.75m-3.50m$17.5k-70.0k
17. Guest lodge Method M3 Check its shoreline setback and emergency approach.350 m²$875.0k-1.75m$8.8k-35.0k
18. Swimming pool Method M11 Provide barriers, disinfection and separate pool drainage.1 set$60.0k-150.0k$1.8k-9.0k
19. Lakeside pavilion Method M12 Check wind exposure and public access restrictions.100 m²$100.0k-250.0k$1.0k-7.5k
20. Private dock label Method M12 A private label does not establish rights to use the lakebed.100 m²$70.0k-180.0k$1.4k-7.2k
21. Lake Method M12 Acquisition, shoreline works and water rights are unpriced.UnresolvedUnpricedUnpriced
22. Courts, paths and grounds Method M15 Maintain sightlines and tree access around the lodge.3 ha$45.0k-150.0k$1.8k-12.0k

Dock and pavilion estate: cost and operation

Construction scenario

Visible feature allowances $6.47m-13.62m

Proposed missing services $196.0k-706.0k

Priced works subtotal $6.67m-14.33m

Professional / permit allowance $800.0k-2.87m

Contingency on priced works $1.67m-5.73m

Scenario envelope, exclusions apply $9.13m-22.93m

Annual operating provision

Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · kWh kilowatt-hour, energy · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency

k (currency) thousand, 1,000 of the stated currency · m (currency) million, 1,000,000 of the stated currency · ARS Argentine peso