Sunset Estate Overview

Complete supplied estate concept. Labels are transcribed in the numbered key that follows. This image does not document a surveyed or built site.

Numbered concept key

No.FeatureBasis
1Main gateLabelled
2Perimeter enclosureVisible form
3Internal roadsVisible form
4Septic systemLabelled
5Trash systemLabelled
6Labelled SPASH systemLabelled
7Furnace and utility zoneLabelled
8Cattle pastureLabelled
9Fish pond and adjacent waterLabelled
10OrchardLabelled
11Greenhouse and gardenLabelled
12Lower vegetable bedsVisible form
13Main manorLabelled
14Sister's houseLabelled
15Parents' houseLabelled
16Unlabelled residenceVisible form
17Barn and stablesLabelled
18Horse arenaLabelled
19Greenhouse villageLabelled
20Water treatmentLabelled
21Upper fuel and storageLabelled
22Lower fuel and storageLabelled
23Service shop and tractor garageLabelled
24Solar farmLabelled
25Recreation poolsVisible form
26Formal fountain and courtsVisible form
27Trees and groundsVisible form

L in square brackets means the source carries a readable label. V means the feature was identified from visible form. At the bottom of the original view, L and R mean left and right. No compass orientation is established. This is a supplied concept

illustration, not a surveyed site or a historical photograph.

Sunset Estate Overview: Components

Items 1-9 of 27 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
1. Main gate Method M1 Keep arrival lighting shielded and the public-road approach clear.1 set$20.0k-60.0k$400-2.4k
2. Perimeter enclosure Method M1 Boundary and drainage geometry need a survey.1800 m$360.0k-1.08m$1.8k-16.2k
3. Internal roads Method M2 Separate service circulation from the formal manor approach.6500 m²$520.0k-1.04m$5.2k-26.0k
4. Septic system Method M9 The illustrated tanks do not establish disposal capacity.1 set$20.0k-100.0k$400-4.0k
5. Trash system Method M9 Provide enclosed collection and washable working surfaces.1 set$10.0k-35.0k$400-2.8k
6. Labelled SPASH system Method unresolved The meaning of this source label is unclear; no invented function or price.UnresolvedUnpricedUnpriced
7. Furnace and utility zone Method M10 Equipment and fuel are not identified; use a provisional heat-plant allowance.1 set$25.0k-100.0k$500-4.0k
8. Cattle pasture Method M5 Prepare a forage budget and manure plan before setting stock numbers.4 ha$32.0k-80.0k$1.3k-6.4k
9. Fish pond and adjacent water Method M12 Two water-feature packages are assumed, not measured earthwork quantities.2 set$120.0k-500.0k$1.8k-20.0k

Items 10-18 of 27 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
10. Orchard Method M6 No tree species is confirmed from this reference.1 ha$15.0k-40.0k$600-3.2k
11. Greenhouse and garden Method M6 This greenhouse is separate from the upper greenhouse village.500 m²$75.0k-250.0k$1.5k-10.0k
Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m (currency) million, 1,000,000 of the stated currency · m² square metre, an area unit · ha hectare, 10,000 square metres