Feature, method and purposeAssumed quantityBuild USDCare/year USD
13. Garage Method M4 Check vehicle dimensions and secure storage needs.250 m²$225.0k-450.0k$2.2k-11.2k
14. Workshop Method M4 Reserve machinery clearances, dust extraction and waste segregation.300 m²$270.0k-540.0k$2.7k-13.5k
15. Food storage Method M4 Identify chilled and dry goods and the delivery frequency.100 m²$90.0k-180.0k$900-4.5k
16. Battery storage Method M7 Define power and usable energy separately.160 kWh$96.0k-160.0k$960-4.0k
17. Solar power Method M7 Confirm shading from the western wall and trees.80 kWdc$160.0k-280.0k$1.6k-5.6k
18. Observation tower Method M14 Height, foundation and fall protection are unverified.1 set$50.0k-250.0k$500-6.2k
19. Grandparents' house Method M3 Prioritize an accessible approach to the shared court.350 m²$875.0k-1.75m$8.8k-35.0k
20. Main family house Method M3 Define bedrooms, guest use and service spaces.900 m²$2.25m-4.50m$22.5k-90.0k
21. Family cottages Method M3 Five 250 m2 cottages are a costing scenario, not surveyed floor areas.1250 m²$3.12m-6.25m$31.2k-125.0k
22. Common courtyard Method M2 Separate walking, seating and maintenance access.900 m²$36.0k-90.0k$360-2.2k
23. Courtyard swimming pool Method M11 Price the pool separately from court paving.1 set$60.0k-150.0k$1.8k-9.0k
24. Fountain Method M11 Include water treatment, cleaning and drain-down access.1 set$10.0k-40.0k$300-2.4k
Feature, method and purposeAssumed quantityBuild USDCare/year USD
25. Planted grounds Method M15 Keep paths and emergency access usable at night.3 ha$45.0k-150.0k$1.8k-12.0k

Shared courtyard estate: cost and operation

Construction scenario

Visible feature allowances $8.47m-17.96m

Proposed missing services $216.0k-806.0k

Priced works subtotal $8.69m-18.77m

Professional / permit allowance $1.04m-3.75m

Contingency on priced works $2.17m-7.51m

Scenario envelope, exclusions apply $11.91m-30.03m

Annual operating provision

Asset care and minor repairs $95.6k-452.1k

Staff: assumed 11 full-time equivalents $550.0k-990.0k

Utilities and operating energy $55.0k-165.0k

Renewal reserve, set aside $86.9k-375.3k

Funded annual subtotal $787.5k-1.98m

P1 Source investigation and supply: $30.0k-150.0k P2 Storage allowance, assumed 20 m3: $6.0k-16.0k P4 Wastewater completion allowance: $20.0k-100.0k P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k

A common courtyard needs shared management

Family cottages and a central pool create common costs and responsibilities. Agree access rules, staffing, cleaning, incident response and cost allocation before construction.

Day and night responsibilities

Open prices: No additional labelled feature is unpriced, but the global exclusions still apply.

Shared Courtyard Estate: Argentine Pesos

Retained scenario conversion

Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · kWh kilowatt-hour, energy · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres

m (currency) million, 1,000,000 of the stated currency · k (currency) thousand, 1,000 of the stated currency · ARS Argentine peso