| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 13. Garage Method M4 Check vehicle dimensions and secure storage needs. | 250 m² | $225.0k-450.0k | $2.2k-11.2k |
| 14. Workshop Method M4 Reserve machinery clearances, dust extraction and waste segregation. | 300 m² | $270.0k-540.0k | $2.7k-13.5k |
| 15. Food storage Method M4 Identify chilled and dry goods and the delivery frequency. | 100 m² | $90.0k-180.0k | $900-4.5k |
| 16. Battery storage Method M7 Define power and usable energy separately. | 160 kWh | $96.0k-160.0k | $960-4.0k |
| 17. Solar power Method M7 Confirm shading from the western wall and trees. | 80 kWdc | $160.0k-280.0k | $1.6k-5.6k |
| 18. Observation tower Method M14 Height, foundation and fall protection are unverified. | 1 set | $50.0k-250.0k | $500-6.2k |
| 19. Grandparents' house Method M3 Prioritize an accessible approach to the shared court. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 20. Main family house Method M3 Define bedrooms, guest use and service spaces. | 900 m² | $2.25m-4.50m | $22.5k-90.0k |
| 21. Family cottages Method M3 Five 250 m2 cottages are a costing scenario, not surveyed floor areas. | 1250 m² | $3.12m-6.25m | $31.2k-125.0k |
| 22. Common courtyard Method M2 Separate walking, seating and maintenance access. | 900 m² | $36.0k-90.0k | $360-2.2k |
| 23. Courtyard swimming pool Method M11 Price the pool separately from court paving. | 1 set | $60.0k-150.0k | $1.8k-9.0k |
| 24. Fountain Method M11 Include water treatment, cleaning and drain-down access. | 1 set | $10.0k-40.0k | $300-2.4k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 25. Planted grounds Method M15 Keep paths and emergency access usable at night. | 3 ha | $45.0k-150.0k | $1.8k-12.0k |
Shared courtyard estate: cost and operation
Construction scenario
Visible feature allowances $8.47m-17.96m
Proposed missing services $216.0k-806.0k
Priced works subtotal $8.69m-18.77m
Professional / permit allowance $1.04m-3.75m
Contingency on priced works $2.17m-7.51m
Scenario envelope, exclusions apply $11.91m-30.03m
Annual operating provision
Asset care and minor repairs $95.6k-452.1k
Staff: assumed 11 full-time equivalents $550.0k-990.0k
Utilities and operating energy $55.0k-165.0k
Renewal reserve, set aside $86.9k-375.3k
Funded annual subtotal $787.5k-1.98m
P1 Source investigation and supply: $30.0k-150.0k P2 Storage allowance, assumed 20 m3: $6.0k-16.0k P4 Wastewater completion allowance: $20.0k-100.0k P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k
A common courtyard needs shared management
Family cottages and a central pool create common costs and responsibilities. Agree access rules, staffing, cleaning, incident response and cost allocation before construction.
Day and night responsibilities
Open prices: No additional labelled feature is unpriced, but the global exclusions still apply.
Shared Courtyard Estate: Argentine Pesos
Retained scenario conversion
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · kWh kilowatt-hour, energy · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres
m (currency) million, 1,000,000 of the stated currency · k (currency) thousand, 1,000 of the stated currency · ARS Argentine peso