Pond-Centred Estate
Complete supplied estate concept. Labels are transcribed in the numbered key that follows. This image does not document a surveyed or built site.
Numbered concept key
| No. | Feature | Basis |
|---|---|---|
| 1 | Entrance gate | Visible form |
| 2 | Boundary fencing | Visible form |
| 3 | Central access road | Visible form |
| 4 | Home 1 | Labelled |
| 5 | Home 2 | Labelled |
| 6 | Home 3 | Labelled |
| 7 | Home 4 | Labelled |
| 8 | Home 5 | Labelled |
| 9 | Big garage | Labelled |
| 10 | Community pond | Labelled |
| 11 | Pond pavilion and jetty | Visible form |
| 12 | Walking track | Labelled |
| 13 | Pasture enclosures | Visible form |
| 14 | Helicopter landing marking | Visible form |
| 15 | Depicted helicopter | Visible form |
| 16 | Landing-area support building | Visible form |
| 17 | Residential pools | Visible form |
| 18 | Small field shelters | Visible form |
| 19 | Pond fountain | Visible form |
| 20 | Grounds and planting | Visible form |
Pond-Centred Estate: Components
Items 1-9 of 20 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 1. Entrance gate Method M1 Check access from the curved public approach. | 1 set | $20.0k-60.0k | $400-2.4k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 2. Boundary fencing Method M1 Confirm ownership along the road and water boundary. | 1300 m | $260.0k-780.0k | $1.3k-11.7k |
| 3. Central access road Method M2 Keep passing and emergency turning independent of household parking. | 4500 m² | $360.0k-720.0k | $3.6k-18.0k |
| 4. Home 1 Method M3 Confirm occupancy, service rooms and gross floor area. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 5. Home 2 Method M3 Check slope and surface-water routing before foundation selection. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 6. Home 3 Method M3 Plan a secure pedestrian connection to the common area. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 7. Home 4 Method M3 Allow independent isolation of water and power. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 8. Home 5 Method M3 Provide housekeeping and waste collection access. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 9. Big garage Method M4 Define stored vehicles and workshop tasks separately. | 400 m² | $360.0k-720.0k | $3.6k-18.0k |
| 10. Community pond Method M12 Investigate flood routing, edges and water quality before recreation use. | 1 set | $60.0k-250.0k | $900-10.0k |
| 11. Pond pavilion and jetty Method M12 Check lakebed and seasonal water-level conditions. | 80 m² | $56.0k-144.0k | $1.1k-5.8k |
| 12. Walking track Method M2 Set gradients and surfacing for intended users and rainfall. | 1500 m² | $60.0k-150.0k | $600-3.8k |
| 13. Pasture enclosures Method M5 Species and stocking rates remain unverified. | 4 ha | $32.0k-80.0k | $1.3k-6.4k |
| 14. Helicopter landing marking Method M13 A marked circle does not establish a compliant heliport. | 1 set | $100.0k-400.0k | $1.0k-10.0k |
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres