Pond-Centred Estate

Complete supplied estate concept. Labels are transcribed in the numbered key that follows. This image does not document a surveyed or built site.

Numbered concept key

No.FeatureBasis
1Entrance gateVisible form
2Boundary fencingVisible form
3Central access roadVisible form
4Home 1Labelled
5Home 2Labelled
6Home 3Labelled
7Home 4Labelled
8Home 5Labelled
9Big garageLabelled
10Community pondLabelled
11Pond pavilion and jettyVisible form
12Walking trackLabelled
13Pasture enclosuresVisible form
14Helicopter landing markingVisible form
15Depicted helicopterVisible form
16Landing-area support buildingVisible form
17Residential poolsVisible form
18Small field sheltersVisible form
19Pond fountainVisible form
20Grounds and plantingVisible form

Pond-Centred Estate: Components

Items 1-9 of 20 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
1. Entrance gate Method M1 Check access from the curved public approach.1 set$20.0k-60.0k$400-2.4k
Feature, method and purposeAssumed quantityBuild USDCare/year USD
2. Boundary fencing Method M1 Confirm ownership along the road and water boundary.1300 m$260.0k-780.0k$1.3k-11.7k
3. Central access road Method M2 Keep passing and emergency turning independent of household parking.4500 m²$360.0k-720.0k$3.6k-18.0k
4. Home 1 Method M3 Confirm occupancy, service rooms and gross floor area.400 m²$1.00m-2.00m$10.0k-40.0k
5. Home 2 Method M3 Check slope and surface-water routing before foundation selection.400 m²$1.00m-2.00m$10.0k-40.0k
6. Home 3 Method M3 Plan a secure pedestrian connection to the common area.400 m²$1.00m-2.00m$10.0k-40.0k
7. Home 4 Method M3 Allow independent isolation of water and power.400 m²$1.00m-2.00m$10.0k-40.0k
8. Home 5 Method M3 Provide housekeeping and waste collection access.400 m²$1.00m-2.00m$10.0k-40.0k
9. Big garage Method M4 Define stored vehicles and workshop tasks separately.400 m²$360.0k-720.0k$3.6k-18.0k
10. Community pond Method M12 Investigate flood routing, edges and water quality before recreation use.1 set$60.0k-250.0k$900-10.0k
11. Pond pavilion and jetty Method M12 Check lakebed and seasonal water-level conditions.80 m²$56.0k-144.0k$1.1k-5.8k
12. Walking track Method M2 Set gradients and surfacing for intended users and rainfall.1500 m²$60.0k-150.0k$600-3.8k
13. Pasture enclosures Method M5 Species and stocking rates remain unverified.4 ha$32.0k-80.0k$1.3k-6.4k
14. Helicopter landing marking Method M13 A marked circle does not establish a compliant heliport.1 set$100.0k-400.0k$1.0k-10.0k
Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres