Feature, method and purposeAssumed quantityBuild USDCare/year USD
2. Boundary fencing Method M1 Confirm ownership along the road and water boundary.1300 m$260.0k-780.0k$1.3k-11.7k
3. Central access road Method M2 Keep passing and emergency turning independent of household parking.4500 m²$360.0k-720.0k$3.6k-18.0k
4. Home 1 Method M3 Confirm occupancy, service rooms and gross floor area.400 m²$1.00m-2.00m$10.0k-40.0k
5. Home 2 Method M3 Check slope and surface-water routing before foundation selection.400 m²$1.00m-2.00m$10.0k-40.0k
6. Home 3 Method M3 Plan a secure pedestrian connection to the common area.400 m²$1.00m-2.00m$10.0k-40.0k
7. Home 4 Method M3 Allow independent isolation of water and power.400 m²$1.00m-2.00m$10.0k-40.0k
8. Home 5 Method M3 Provide housekeeping and waste collection access.400 m²$1.00m-2.00m$10.0k-40.0k
9. Big garage Method M4 Define stored vehicles and workshop tasks separately.400 m²$360.0k-720.0k$3.6k-18.0k
10. Community pond Method M12 Investigate flood routing, edges and water quality before recreation use.1 set$60.0k-250.0k$900-10.0k
11. Pond pavilion and jetty Method M12 Check lakebed and seasonal water-level conditions.80 m²$56.0k-144.0k$1.1k-5.8k
12. Walking track Method M2 Set gradients and surfacing for intended users and rainfall.1500 m²$60.0k-150.0k$600-3.8k
13. Pasture enclosures Method M5 Species and stocking rates remain unverified.4 ha$32.0k-80.0k$1.3k-6.4k
14. Helicopter landing marking Method M13 A marked circle does not establish a compliant heliport.1 set$100.0k-400.0k$1.0k-10.0k
Feature, method and purposeAssumed quantityBuild USDCare/year USD
15. Depicted helicopter Method M13 Purchase, crew and flight operations require a specific aircraft budget.UnresolvedUnpricedUnpriced
16. Landing-area support building Method M4 Actual function is unknown; budget only a small service building scenario.80 m²$72.0k-144.0k$720-3.6k
17. Residential pools Method M11 Five pool packages are assumed for comparison.5 set$300.0k-750.0k$9.0k-45.0k
18. Small field shelters Method M5 Species, ventilation and weather protection need a livestock brief.100 m²$60.0k-150.0k$900-4.5k
19. Pond fountain Method M11 Aeration performance is not established by the visible spray.1 set$10.0k-40.0k$300-2.4k
20. Grounds and planting Method M15 Preserve access for drainage and fence maintenance.3 ha$45.0k-150.0k$1.8k-12.0k

Pond-centred estate: cost and operation

Construction scenario

Visible feature allowances $6.79m-14.54m

Proposed missing services $236.0k-906.0k

Priced works subtotal $7.03m-15.44m

Professional / permit allowance $843.7k-3.09m

Contingency on priced works $1.76m-6.18m

Scenario envelope, exclusions apply $9.63m-24.71m

Annual operating provision

Asset care and minor repairs $81.2k-389.8k

Staff: assumed 10 full-time equivalents $500.0k-900.0k

Utilities and operating energy $50.0k-150.0k

Renewal reserve, set aside $70.3k-308.9k

Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres

k (currency) thousand, 1,000 of the stated currency · ARS Argentine peso