| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 2. Boundary fencing Method M1 Confirm ownership along the road and water boundary. | 1300 m | $260.0k-780.0k | $1.3k-11.7k |
| 3. Central access road Method M2 Keep passing and emergency turning independent of household parking. | 4500 m² | $360.0k-720.0k | $3.6k-18.0k |
| 4. Home 1 Method M3 Confirm occupancy, service rooms and gross floor area. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 5. Home 2 Method M3 Check slope and surface-water routing before foundation selection. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 6. Home 3 Method M3 Plan a secure pedestrian connection to the common area. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 7. Home 4 Method M3 Allow independent isolation of water and power. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 8. Home 5 Method M3 Provide housekeeping and waste collection access. | 400 m² | $1.00m-2.00m | $10.0k-40.0k |
| 9. Big garage Method M4 Define stored vehicles and workshop tasks separately. | 400 m² | $360.0k-720.0k | $3.6k-18.0k |
| 10. Community pond Method M12 Investigate flood routing, edges and water quality before recreation use. | 1 set | $60.0k-250.0k | $900-10.0k |
| 11. Pond pavilion and jetty Method M12 Check lakebed and seasonal water-level conditions. | 80 m² | $56.0k-144.0k | $1.1k-5.8k |
| 12. Walking track Method M2 Set gradients and surfacing for intended users and rainfall. | 1500 m² | $60.0k-150.0k | $600-3.8k |
| 13. Pasture enclosures Method M5 Species and stocking rates remain unverified. | 4 ha | $32.0k-80.0k | $1.3k-6.4k |
| 14. Helicopter landing marking Method M13 A marked circle does not establish a compliant heliport. | 1 set | $100.0k-400.0k | $1.0k-10.0k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 15. Depicted helicopter Method M13 Purchase, crew and flight operations require a specific aircraft budget. | Unresolved | Unpriced | Unpriced |
| 16. Landing-area support building Method M4 Actual function is unknown; budget only a small service building scenario. | 80 m² | $72.0k-144.0k | $720-3.6k |
| 17. Residential pools Method M11 Five pool packages are assumed for comparison. | 5 set | $300.0k-750.0k | $9.0k-45.0k |
| 18. Small field shelters Method M5 Species, ventilation and weather protection need a livestock brief. | 100 m² | $60.0k-150.0k | $900-4.5k |
| 19. Pond fountain Method M11 Aeration performance is not established by the visible spray. | 1 set | $10.0k-40.0k | $300-2.4k |
| 20. Grounds and planting Method M15 Preserve access for drainage and fence maintenance. | 3 ha | $45.0k-150.0k | $1.8k-12.0k |
Pond-centred estate: cost and operation
Construction scenario
Visible feature allowances $6.79m-14.54m
Proposed missing services $236.0k-906.0k
Priced works subtotal $7.03m-15.44m
Professional / permit allowance $843.7k-3.09m
Contingency on priced works $1.76m-6.18m
Scenario envelope, exclusions apply $9.63m-24.71m
Annual operating provision
Asset care and minor repairs $81.2k-389.8k
Staff: assumed 10 full-time equivalents $500.0k-900.0k
Utilities and operating energy $50.0k-150.0k
Renewal reserve, set aside $70.3k-308.9k
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres
k (currency) thousand, 1,000 of the stated currency · ARS Argentine peso
