Feature, method and purposeAssumed quantityBuild USDCare/year USD
15. Depicted helicopter Method M13 Purchase, crew and flight operations require a specific aircraft budget.UnresolvedUnpricedUnpriced
16. Landing-area support building Method M4 Actual function is unknown; budget only a small service building scenario.80 m²$72.0k-144.0k$720-3.6k
17. Residential pools Method M11 Five pool packages are assumed for comparison.5 set$300.0k-750.0k$9.0k-45.0k
18. Small field shelters Method M5 Species, ventilation and weather protection need a livestock brief.100 m²$60.0k-150.0k$900-4.5k
19. Pond fountain Method M11 Aeration performance is not established by the visible spray.1 set$10.0k-40.0k$300-2.4k
20. Grounds and planting Method M15 Preserve access for drainage and fence maintenance.3 ha$45.0k-150.0k$1.8k-12.0k

Pond-centred estate: cost and operation

Construction scenario

Visible feature allowances $6.79m-14.54m

Proposed missing services $236.0k-906.0k

Priced works subtotal $7.03m-15.44m

Professional / permit allowance $843.7k-3.09m

Contingency on priced works $1.76m-6.18m

Scenario envelope, exclusions apply $9.63m-24.71m

Annual operating provision

Asset care and minor repairs $81.2k-389.8k

Staff: assumed 10 full-time equivalents $500.0k-900.0k

Utilities and operating energy $50.0k-150.0k

Renewal reserve, set aside $70.3k-308.9k

Pond-Centred Estate: costs and responsibilities

Component Build · ARS million Care · ARS million/year

ComponentBuild / ARS millionCare / ARS million per year
1. Entrance gate30.800 to 92.4000.616 to 3.696
2. Boundary fencing400.400 to 1,201.2002.002 to 18.018
3. Central access road554.400 to 1,108.8005.544 to 27.720
4. Home 11,540.000 to 3,080.00015.400 to 61.600
5. Home 21,540.000 to 3,080.00015.400 to 61.600
6. Home 31,540.000 to 3,080.00015.400 to 61.600
7. Home 41,540.000 to 3,080.00015.400 to 61.600
8. Home 51,540.000 to 3,080.00015.400 to 61.600
9. Big garage554.400 to 1,108.8005.544 to 27.720
10. Community pond92.400 to 385.0001.386 to 15.400
11. Pond pavilion and jetty86.240 to 221.7601.725 to 8.870
12. Walking track92.400 to 231.0000.924 to 5.775
13. Pasture enclosures49.280 to 123.2001.971 to 9.856
14. Helicopter landing marking154.000 to 616.0001.540 to 15.400
15. Depicted helicopterUNPRICEDUNPRICED
16. Landing-area support building110.880 to 221.7601.109 to 5.544
17. Residential pools462.000 to 1,155.00013.860 to 69.300
18. Small field shelters92.400 to 231.0001.386 to 6.930
19. Pond fountain15.400 to 61.6000.462 to 3.696
20. Grounds and planting69.300 to 231.0002.772 to 18.480

Build envelope: ARS 14,834.004 to 38,054.016 million. Annual fund: ARS 1,080.387 to 2,692.890 million. Totals include service, fee and contingency or staffing and reserve allowances beyond the rows. Unpriced items remain excluded.

Staff: $50k-90k per FTE/year, chosen loaded allowance. Utilities: $5k-15k per FTE/year as a coarse placeholder, not an energy calculation. Replace both with rosters and metered demand. Taxes, insurance, food, feed, aircraft and exceptional works are additional. Proposed services, not verified: P1 Source investigation and supply: $30.0k-150.0k P2 Storage allowance, assumed 20 m³: $6.0k-16.0k P3 Treatment allowance: $20.0k-100.0k P4 Wastewater completion allowance: $20.0k-100.0k P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k Plan the shared pond. Five homes share roads, water edges and a garage. Define ownership, maintenance access and the annual contribution formula. The helicopter marking is not evidence that flight operations are feasible. Day and night responsibilities. Day: inspect access and water/energy alarms; handle deliveries; separate food, livestock and waste routes; complete scheduled maintenance. Night: check routes and gate release; shield lights; secure service areas; assign emergency contacts. This is not a 24-hour staffed security commitment.

Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres

k (currency) thousand, 1,000 of the stated currency · ARS Argentine peso

ARS Argentine peso

k (currency) thousand, 1,000 of the stated currency · m³ cubic metre, a volume unit · BY-SA Creative Commons Attribution-ShareAlike