| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 15. Depicted helicopter Method M13 Purchase, crew and flight operations require a specific aircraft budget. | Unresolved | Unpriced | Unpriced |
| 16. Landing-area support building Method M4 Actual function is unknown; budget only a small service building scenario. | 80 m² | $72.0k-144.0k | $720-3.6k |
| 17. Residential pools Method M11 Five pool packages are assumed for comparison. | 5 set | $300.0k-750.0k | $9.0k-45.0k |
| 18. Small field shelters Method M5 Species, ventilation and weather protection need a livestock brief. | 100 m² | $60.0k-150.0k | $900-4.5k |
| 19. Pond fountain Method M11 Aeration performance is not established by the visible spray. | 1 set | $10.0k-40.0k | $300-2.4k |
| 20. Grounds and planting Method M15 Preserve access for drainage and fence maintenance. | 3 ha | $45.0k-150.0k | $1.8k-12.0k |
Pond-centred estate: cost and operation
Construction scenario
Visible feature allowances $6.79m-14.54m
Proposed missing services $236.0k-906.0k
Priced works subtotal $7.03m-15.44m
Professional / permit allowance $843.7k-3.09m
Contingency on priced works $1.76m-6.18m
Scenario envelope, exclusions apply $9.63m-24.71m
Annual operating provision
Asset care and minor repairs $81.2k-389.8k
Staff: assumed 10 full-time equivalents $500.0k-900.0k
Utilities and operating energy $50.0k-150.0k
Renewal reserve, set aside $70.3k-308.9k
Pond-Centred Estate: costs and responsibilities
Component Build · ARS million Care · ARS million/year
| Component | Build / ARS million | Care / ARS million per year |
|---|---|---|
| 1. Entrance gate | 30.800 to 92.400 | 0.616 to 3.696 |
| 2. Boundary fencing | 400.400 to 1,201.200 | 2.002 to 18.018 |
| 3. Central access road | 554.400 to 1,108.800 | 5.544 to 27.720 |
| 4. Home 1 | 1,540.000 to 3,080.000 | 15.400 to 61.600 |
| 5. Home 2 | 1,540.000 to 3,080.000 | 15.400 to 61.600 |
| 6. Home 3 | 1,540.000 to 3,080.000 | 15.400 to 61.600 |
| 7. Home 4 | 1,540.000 to 3,080.000 | 15.400 to 61.600 |
| 8. Home 5 | 1,540.000 to 3,080.000 | 15.400 to 61.600 |
| 9. Big garage | 554.400 to 1,108.800 | 5.544 to 27.720 |
| 10. Community pond | 92.400 to 385.000 | 1.386 to 15.400 |
| 11. Pond pavilion and jetty | 86.240 to 221.760 | 1.725 to 8.870 |
| 12. Walking track | 92.400 to 231.000 | 0.924 to 5.775 |
| 13. Pasture enclosures | 49.280 to 123.200 | 1.971 to 9.856 |
| 14. Helicopter landing marking | 154.000 to 616.000 | 1.540 to 15.400 |
| 15. Depicted helicopter | UNPRICED | UNPRICED |
| 16. Landing-area support building | 110.880 to 221.760 | 1.109 to 5.544 |
| 17. Residential pools | 462.000 to 1,155.000 | 13.860 to 69.300 |
| 18. Small field shelters | 92.400 to 231.000 | 1.386 to 6.930 |
| 19. Pond fountain | 15.400 to 61.600 | 0.462 to 3.696 |
| 20. Grounds and planting | 69.300 to 231.000 | 2.772 to 18.480 |
Build envelope: ARS 14,834.004 to 38,054.016 million. Annual fund: ARS 1,080.387 to 2,692.890 million. Totals include service, fee and contingency or staffing and reserve allowances beyond the rows. Unpriced items remain excluded.
Staff: $50k-90k per FTE/year, chosen loaded allowance. Utilities: $5k-15k per FTE/year as a coarse placeholder, not an energy calculation. Replace both with rosters and metered demand. Taxes, insurance, food, feed, aircraft and exceptional works are additional. Proposed services, not verified: P1 Source investigation and supply: $30.0k-150.0k P2 Storage allowance, assumed 20 m³: $6.0k-16.0k P3 Treatment allowance: $20.0k-100.0k P4 Wastewater completion allowance: $20.0k-100.0k P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k Plan the shared pond. Five homes share roads, water edges and a garage. Define ownership, maintenance access and the annual contribution formula. The helicopter marking is not evidence that flight operations are feasible. Day and night responsibilities. Day: inspect access and water/energy alarms; handle deliveries; separate food, livestock and waste routes; complete scheduled maintenance. Night: check routes and gate release; shield lights; secure service areas; assign emergency contacts. This is not a 24-hour staffed security commitment.
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres
k (currency) thousand, 1,000 of the stated currency · ARS Argentine peso
ARS Argentine peso
k (currency) thousand, 1,000 of the stated currency · m³ cubic metre, a volume unit · BY-SA Creative Commons Attribution-ShareAlike