Read the scene and its key together

Agricultural Service Estate: Components

Items 1-9 of 31 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
1. Entrance gate Method M1 Separate public arrival from manure and delivery traffic.1 set$20.0k-60.0k$400-2.4k
2. Perimeter wall Method M1 Confirm the boundary and allow lawful drainage paths.1800 m$360.0k-1.08m$1.8k-16.2k
3. Access spine Method M2 Keep farm loading clear of the route to the main house.5500 m²$440.0k-880.0k$4.4k-22.0k
4. Trash system Method M9 Contain waste and maintain collection access.1 set$10.0k-35.0k$400-2.8k
5. Furnace Method M10 Fuel, flue and heat demand are unspecified.1 set$25.0k-100.0k$500-4.0k
6. Septic system Method M9 Reserve a tested disposal and replacement area outside crop beds.1 set$20.0k-100.0k$400-4.0k
7. Borehole and tanks Method M8 Yield, water chemistry and drilling permission are unverified.1 set$30.0k-150.0k$600-6.0k
8. Water storage tanks Method M8 The 40 m3 allowance is assumed, not measured from the cylinders.40 m3$12.0k-32.0k$120-640
9. Goat area Method M5 Model fencing and water points; stocking requires a feed plan.0.5 ha$4.0k-10.0k$160-800

Items 10-18 of 31 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
10. Chicken coop Method M5 Keep feed and egg handling outside manure routes.100 m²$25.0k-70.0k$500-2.8k
11. Rabbit hutches Method M5 Two labelled groups form one package; housing must suit species and climate.60 m²$15.0k-42.0k$300-1.7k
12. Farm workshop and machinery Method M4 The misspelt source label does not establish equipment type or capacity.350 m²$315.0k-630.0k$3.1k-15.8k
13. Solar farm Method M7 Check shading, wind loading and isolation access.80 kWdc$160.0k-280.0k$1.6k-5.6k
14. Cattle grazing area Method M5 This is distinct from the upper cattle pasture.3 ha$24.0k-60.0k$960-4.8k
15. Horse grazing area Method M5 Do not infer carrying capacity from the depicted horses.2 ha$16.0k-40.0k$640-3.2k
16. Horse stable and riding arena Method M5 Arena footing and drainage are an additional design task.450 m²$270.0k-675.0k$4.0k-20.2k
17. Family homes Method M3 Two 350 m2 homes are assumed for the budget.700 m²$1.75m-3.50m$17.5k-70.0k
18. Guest lodge Method M3 Include guest water and waste demand in the shared utility brief.300 m²$750.0k-1.50m$7.5k-30.0k

Items 19-27 of 31 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
19. Main house Method M3 Confirm room schedule, occupancy and service access.900 m²$2.25m-4.50m$22.5k-90.0k
20. Swimming pool Method M11 Keep circulation and treatment separate from potable water.1 set$60.0k-150.0k$1.8k-9.0k
Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m metre, a length unit · m (currency) million, 1,000,000 of the stated currency · m² square metre, an area unit · ha hectare, 10,000 square metres

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres