| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 21. Vegetable garden Method M6 Confirm soil and irrigation quality before choosing crops. | 1800 m² | $36.0k-108.0k | $1.4k-8.6k |
| 22. Greenhouses Method M6 Provide heat-load and ventilation calculations for the selected crop. | 600 m² | $90.0k-300.0k | $1.8k-12.0k |
| 23. Fruit orchard and berry garden Method M6 Neither species identity nor yield is verified. | 1.2 ha | $18.0k-48.0k | $720-3.8k |
| 24. Fish pond and pavilion Method M12 No stocking, dam or water-rights specification is established. | 1 set | $60.0k-250.0k | $900-10.0k |
| 25. Small pond and shelter Method M12 Confirm whether it is a separate hydraulic system. | 1 set | $60.0k-250.0k | $900-10.0k |
| 26. Cattle pasture Method M5 Plan rotation and winter forage before stocking. | 5 ha | $40.0k-100.0k | $1.6k-8.0k |
| 27. Horse paddock Method M5 Specify fence type from species and local conditions. | 3 ha | $24.0k-60.0k | $960-4.8k |
| 28. Windmill power backup label Method M7 A decorative rotor does not verify energy performance; quote and resource study required. | Unresolved | Unpriced | Unpriced |
| 29. Fountain court Method M11 Provide cleaning and water-quality management. | 1 set | $10.0k-40.0k | $300-2.4k |
| 30. Vehicle and farm equipment pool Method M4 One provisional machinery allowance; no image-derived fleet valuation. | 1 set | $80.0k-250.0k | $4.0k-25.0k |
| 31. Grounds and shelter belts Method M15 Species and mature growth need local assessment. | 4 ha | $60.0k-200.0k | $2.4k-16.0k |
Agricultural service estate: cost and operation
Construction scenario
Visible feature allowances $7.03m-15.50m
Proposed missing services $180.0k-640.0k
Priced works subtotal $7.21m-16.14m
Professional / permit allowance $865.7k-3.23m
Contingency on priced works $1.80m-6.46m
Scenario envelope, exclusions apply $9.88m-25.82m
Annual operating provision
Asset care and minor repairs $87.9k-438.2k
Staff: assumed 14 full-time equivalents $700.0k-1.26m
Utilities and operating energy $70.0k-210.0k
Renewal reserve, set aside $72.1k-322.8k
Funded annual subtotal $930.0k-2.23m
P3 Treatment allowance: $20.0k-100.0k P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k
Agriculture needs a measured carrying capacity
The picture depicts many species and growing systems. Prepare separate feed, manure, water, biosecurity and staffing budgets. Do not assume the pictured acreage can support the pictured animals.
Day and night responsibilities
Open prices: Windmill power backup label
Agricultural Service Estate: Argentine Pesos
Retained scenario conversion
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · ha hectare, 10,000 square metres · m (currency) million, 1,000,000 of the stated currency
ARS Argentine peso
