Mountain-Waterfront Estate
Complete supplied estate concept. Labels are transcribed in the numbered key that follows. This image does not document a surveyed or built site.
Numbered concept key
| No. | Feature | Basis |
|---|---|---|
| 1 | Main gate | Labelled |
| 2 | Security post | Labelled |
| 3 | Lookout tower | Labelled |
| 4 | Perimeter fence | Labelled |
| 5 | Access road | Labelled |
| 6 | Public road connection | Labelled |
| 7 | Hidden shelter entrance | Labelled |
| 8 | Septic system | Labelled |
| 9 | Furnace | Labelled |
| 10 | Trash system | Labelled |
| 11 | Standby enclosure | Labelled |
| 12 | Battery storage | Labelled |
| 13 | Solar array | Labelled |
| 14 | Service area | Labelled |
| 15 | Food storage | Labelled |
| 16 | Vehicle bay | Labelled |
| 17 | Garage and workshop | Labelled |
| 18 | Well and pump house | Labelled |
| 19 | Water storage | Labelled |
| 20 | Water filtration | Labelled |
| 21 | Main house | Labelled |
| 22 | Parents' house | Labelled |
| 23 | Grandparents' house | Labelled |
| 24 | Guest house | Labelled |
| 25 | Chicken coop | Labelled |
| 26 | Chicken runs | Labelled |
| 27 | Orchard | Labelled |
| 28 | Vegetable gardens | Labelled |
| 29 | Greenhouse | Labelled |
| 30 | Terraces and retaining systems | Visible form |
| 31 | Courts and fountain | Visible form |
| 32 | Cliff vegetation and grounds | Visible form |
Read the scene and its key together
Mountain-Waterfront Estate: Components
Items 1-9 of 32 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 1. Main gate Method M1 Do not assume the steep approach meets emergency access needs. | 1 set | $20.0k-60.0k | $400-2.4k |
| 2. Security post Method M1 Provide communication and manual gate release. | 40 m² | $60.0k-120.0k | $600-2.4k |
| 3. Lookout tower Method M14 Foundation, height and fall protection need structural design. | 1 set | $50.0k-250.0k | $500-6.2k |
| 4. Perimeter fence Method M1 The cliff edge is not a verified property boundary. | 1400 m | $280.0k-840.0k | $1.4k-12.6k |
| 5. Access road Method M2 Grades, rock cuts, drainage and guard systems remain unverified. | 4500 m² | $360.0k-720.0k | $3.6k-18.0k |
| 6. Public road connection Method unresolved Off-site junction works and permissions are unpriced. | Unresolved | Unpriced | Unpriced |
| 7. Hidden shelter entrance Method M14 No underground geometry or protective rating is established. | 100 m² | $350.0k-900.0k | $3.5k-27.0k |
| 8. Septic system Method M9 Cliffside disposal cannot be assumed feasible from the image. | 1 set | $20.0k-100.0k | $400-4.0k |
| 9. Furnace Method M10 Fuel, flue and heat duty require selection and design. | 1 set | $25.0k-100.0k | $500-4.0k |
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m metre, a length unit
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m metre, a length unit · kWh kilowatt-hour, energy
