Read the scene and its key together
Mountain-Waterfront Estate: Components
Items 1-9 of 32 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 1. Main gate Method M1 Do not assume the steep approach meets emergency access needs. | 1 set | $20.0k-60.0k | $400-2.4k |
| 2. Security post Method M1 Provide communication and manual gate release. | 40 m² | $60.0k-120.0k | $600-2.4k |
| 3. Lookout tower Method M14 Foundation, height and fall protection need structural design. | 1 set | $50.0k-250.0k | $500-6.2k |
| 4. Perimeter fence Method M1 The cliff edge is not a verified property boundary. | 1400 m | $280.0k-840.0k | $1.4k-12.6k |
| 5. Access road Method M2 Grades, rock cuts, drainage and guard systems remain unverified. | 4500 m² | $360.0k-720.0k | $3.6k-18.0k |
| 6. Public road connection Method unresolved Off-site junction works and permissions are unpriced. | Unresolved | Unpriced | Unpriced |
| 7. Hidden shelter entrance Method M14 No underground geometry or protective rating is established. | 100 m² | $350.0k-900.0k | $3.5k-27.0k |
| 8. Septic system Method M9 Cliffside disposal cannot be assumed feasible from the image. | 1 set | $20.0k-100.0k | $400-4.0k |
| 9. Furnace Method M10 Fuel, flue and heat duty require selection and design. | 1 set | $25.0k-100.0k | $500-4.0k |
Items 10-18 of 32 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 10. Trash system Method M9 Prevent waste and leachate from entering cliff drainage. | 1 set | $10.0k-35.0k | $400-2.8k |
| 11. Standby enclosure Method M10 The source labels standby equipment; type, rating and fuel remain unverified. | 1 set | $25.0k-100.0k | $500-5.0k |
| 12. Battery storage Method M7 Check isolation, fire response and equipment replacement access. | 160 kWh | $96.0k-160.0k | $960-4.0k |
| 13. Solar array Method M7 Cliff winds and rock foundations require site-specific assessment. | 80 kWdc | $160.0k-280.0k | $1.6k-5.6k |
| 14. Service area Method M2 Reserve delivery, waste collection and treatment access. | 400 m² | $32.0k-64.0k | $320-1.6k |
| 15. Food storage Method M4 Define dry and chilled storage before selecting equipment. | 100 m² | $90.0k-180.0k | $900-4.5k |
| 16. Vehicle bay Method M4 Keep parked vehicles clear of utility access. | 150 m² | $135.0k-270.0k | $1.4k-6.8k |
| 17. Garage and workshop Method M4 Specify machinery loads, ventilation and contained drainage. | 350 m² | $315.0k-630.0k | $3.1k-15.8k |
| 18. Well and pump house Method M8 A cliffside well label proves neither aquifer yield nor legal abstraction. | 1 set | $30.0k-150.0k | $600-6.0k |
Items 19-27 of 32 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 19. Water storage Method M8 Volume is an assumed budget quantity only. | 40 m3 | $12.0k-32.0k | $120-640 |
| 20. Water filtration Method M8 Use test results to select treatment and residual disposal. | 1 set | $20.0k-100.0k | $800-8.0k |
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m metre, a length unit
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m metre, a length unit · kWh kilowatt-hour, energy
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres