Items 10-18 of 32 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
10. Trash system Method M9 Prevent waste and leachate from entering cliff drainage.1 set$10.0k-35.0k$400-2.8k
11. Standby enclosure Method M10 The source labels standby equipment; type, rating and fuel remain unverified.1 set$25.0k-100.0k$500-5.0k
12. Battery storage Method M7 Check isolation, fire response and equipment replacement access.160 kWh$96.0k-160.0k$960-4.0k
13. Solar array Method M7 Cliff winds and rock foundations require site-specific assessment.80 kWdc$160.0k-280.0k$1.6k-5.6k
14. Service area Method M2 Reserve delivery, waste collection and treatment access.400 m²$32.0k-64.0k$320-1.6k
15. Food storage Method M4 Define dry and chilled storage before selecting equipment.100 m²$90.0k-180.0k$900-4.5k
16. Vehicle bay Method M4 Keep parked vehicles clear of utility access.150 m²$135.0k-270.0k$1.4k-6.8k
17. Garage and workshop Method M4 Specify machinery loads, ventilation and contained drainage.350 m²$315.0k-630.0k$3.1k-15.8k
18. Well and pump house Method M8 A cliffside well label proves neither aquifer yield nor legal abstraction.1 set$30.0k-150.0k$600-6.0k

Items 19-27 of 32 | All quantities and prices below are scenario assumptions

Feature, method and purposeAssumed quantityBuild USDCare/year USD
19. Water storage Method M8 Volume is an assumed budget quantity only.40 m3$12.0k-32.0k$120-640
20. Water filtration Method M8 Use test results to select treatment and residual disposal.1 set$20.0k-100.0k$800-8.0k
Feature, method and purposeAssumed quantityBuild USDCare/year USD
21. Main house Method M3 Geotechnical stability precedes any foundation or cantilever design.900 m²$2.25m-4.50m$22.5k-90.0k
22. Parents' house Method M3 Confirm accessible routes and ground support.350 m²$875.0k-1.75m$8.8k-35.0k
23. Grandparents' house Method M3 The pictured terrace edge must not be treated as an approved setback.350 m²$875.0k-1.75m$8.8k-35.0k
24. Guest house Method M3 Review evacuation and service access on the limited terrace.300 m²$750.0k-1.50m$7.5k-30.0k
25. Chicken coop Method M5 Protect runoff and provide manure collection access.80 m²$20.0k-56.0k$400-2.2k
26. Chicken runs Method M5 Choose mesh and barriers for species and predator exposure.100 m²$25.0k-70.0k$500-2.8k
27. Orchard Method M6 Species and root spread must suit the terrace and services.0.5 ha$7.5k-20.0k$300-1.6k
28. Vegetable gardens Method M6 Soil depth and irrigation quality remain unknown.1400 m²$28.0k-84.0k$1.1k-6.7k
29. Greenhouse Method M6 Wind anchorage and terrace drainage need engineering.500 m²$75.0k-250.0k$1.5k-10.0k
30. Terraces and retaining systems Method M14 The 600 m2 face area is a scenario, not a measured or designed wall.600 m²$300.0k-900.0k$1.5k-13.5k
31. Courts and fountain Method M11 Keep ornamental water away from vulnerable slope drainage.1 set$10.0k-40.0k$300-2.4k
32. Cliff vegetation and grounds Method M15 Rockfall, slope stability and habitat constraints remain unresolved.2 ha$30.0k-100.0k$1.2k-8.0k
Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m metre, a length unit · kWh kilowatt-hour, energy