Items 10-18 of 32 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 10. Trash system Method M9 Prevent waste and leachate from entering cliff drainage. | 1 set | $10.0k-35.0k | $400-2.8k |
| 11. Standby enclosure Method M10 The source labels standby equipment; type, rating and fuel remain unverified. | 1 set | $25.0k-100.0k | $500-5.0k |
| 12. Battery storage Method M7 Check isolation, fire response and equipment replacement access. | 160 kWh | $96.0k-160.0k | $960-4.0k |
| 13. Solar array Method M7 Cliff winds and rock foundations require site-specific assessment. | 80 kWdc | $160.0k-280.0k | $1.6k-5.6k |
| 14. Service area Method M2 Reserve delivery, waste collection and treatment access. | 400 m² | $32.0k-64.0k | $320-1.6k |
| 15. Food storage Method M4 Define dry and chilled storage before selecting equipment. | 100 m² | $90.0k-180.0k | $900-4.5k |
| 16. Vehicle bay Method M4 Keep parked vehicles clear of utility access. | 150 m² | $135.0k-270.0k | $1.4k-6.8k |
| 17. Garage and workshop Method M4 Specify machinery loads, ventilation and contained drainage. | 350 m² | $315.0k-630.0k | $3.1k-15.8k |
| 18. Well and pump house Method M8 A cliffside well label proves neither aquifer yield nor legal abstraction. | 1 set | $30.0k-150.0k | $600-6.0k |
Items 19-27 of 32 | All quantities and prices below are scenario assumptions
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 19. Water storage Method M8 Volume is an assumed budget quantity only. | 40 m3 | $12.0k-32.0k | $120-640 |
| 20. Water filtration Method M8 Use test results to select treatment and residual disposal. | 1 set | $20.0k-100.0k | $800-8.0k |
| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 21. Main house Method M3 Geotechnical stability precedes any foundation or cantilever design. | 900 m² | $2.25m-4.50m | $22.5k-90.0k |
| 22. Parents' house Method M3 Confirm accessible routes and ground support. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 23. Grandparents' house Method M3 The pictured terrace edge must not be treated as an approved setback. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 24. Guest house Method M3 Review evacuation and service access on the limited terrace. | 300 m² | $750.0k-1.50m | $7.5k-30.0k |
| 25. Chicken coop Method M5 Protect runoff and provide manure collection access. | 80 m² | $20.0k-56.0k | $400-2.2k |
| 26. Chicken runs Method M5 Choose mesh and barriers for species and predator exposure. | 100 m² | $25.0k-70.0k | $500-2.8k |
| 27. Orchard Method M6 Species and root spread must suit the terrace and services. | 0.5 ha | $7.5k-20.0k | $300-1.6k |
| 28. Vegetable gardens Method M6 Soil depth and irrigation quality remain unknown. | 1400 m² | $28.0k-84.0k | $1.1k-6.7k |
| 29. Greenhouse Method M6 Wind anchorage and terrace drainage need engineering. | 500 m² | $75.0k-250.0k | $1.5k-10.0k |
| 30. Terraces and retaining systems Method M14 The 600 m2 face area is a scenario, not a measured or designed wall. | 600 m² | $300.0k-900.0k | $1.5k-13.5k |
| 31. Courts and fountain Method M11 Keep ornamental water away from vulnerable slope drainage. | 1 set | $10.0k-40.0k | $300-2.4k |
| 32. Cliff vegetation and grounds Method M15 Rockfall, slope stability and habitat constraints remain unresolved. | 2 ha | $30.0k-100.0k | $1.2k-8.0k |
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m metre, a length unit · kWh kilowatt-hour, energy
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres