| Feature, method and purpose | Assumed quantity | Build USD | Care/year USD |
|---|---|---|---|
| 21. Main house Method M3 Geotechnical stability precedes any foundation or cantilever design. | 900 m² | $2.25m-4.50m | $22.5k-90.0k |
| 22. Parents' house Method M3 Confirm accessible routes and ground support. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 23. Grandparents' house Method M3 The pictured terrace edge must not be treated as an approved setback. | 350 m² | $875.0k-1.75m | $8.8k-35.0k |
| 24. Guest house Method M3 Review evacuation and service access on the limited terrace. | 300 m² | $750.0k-1.50m | $7.5k-30.0k |
| 25. Chicken coop Method M5 Protect runoff and provide manure collection access. | 80 m² | $20.0k-56.0k | $400-2.2k |
| 26. Chicken runs Method M5 Choose mesh and barriers for species and predator exposure. | 100 m² | $25.0k-70.0k | $500-2.8k |
| 27. Orchard Method M6 Species and root spread must suit the terrace and services. | 0.5 ha | $7.5k-20.0k | $300-1.6k |
| 28. Vegetable gardens Method M6 Soil depth and irrigation quality remain unknown. | 1400 m² | $28.0k-84.0k | $1.1k-6.7k |
| 29. Greenhouse Method M6 Wind anchorage and terrace drainage need engineering. | 500 m² | $75.0k-250.0k | $1.5k-10.0k |
| 30. Terraces and retaining systems Method M14 The 600 m2 face area is a scenario, not a measured or designed wall. | 600 m² | $300.0k-900.0k | $1.5k-13.5k |
| 31. Courts and fountain Method M11 Keep ornamental water away from vulnerable slope drainage. | 1 set | $10.0k-40.0k | $300-2.4k |
| 32. Cliff vegetation and grounds Method M15 Rockfall, slope stability and habitat constraints remain unresolved. | 2 ha | $30.0k-100.0k | $1.2k-8.0k |
Mountain-waterfront estate: cost and operation
Construction scenario
Visible feature allowances $7.34m-16.11m
Proposed missing services $160.0k-540.0k
Priced works subtotal $7.50m-16.65m
Professional / permit allowance $899.5k-3.33m
Contingency on priced works $1.87m-6.66m
Scenario envelope, exclusions apply $10.27m-26.64m
Annual operating provision
Asset care and minor repairs $79.1k-396.1k
Staff: assumed 12 full-time equivalents $600.0k-1.08m
Utilities and operating energy $60.0k-180.0k
Renewal reserve, set aside $75.0k-333.0k
Funded annual subtotal $814.1k-1.99m
P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k
Geotechnical feasibility before the master plan
Cliff terraces, underground space and a constrained approach dominate this concept. Investigate slope stability, groundwater, rockfall and emergency access before assigning structural dimensions.
Day and night responsibilities
Open prices: Public road connection
Mountain-Waterfront Estate: Argentine Pesos
Retained scenario conversion
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres
ARS Argentine peso
