Feature, method and purposeAssumed quantityBuild USDCare/year USD
21. Main house Method M3 Geotechnical stability precedes any foundation or cantilever design.900 m²$2.25m-4.50m$22.5k-90.0k
22. Parents' house Method M3 Confirm accessible routes and ground support.350 m²$875.0k-1.75m$8.8k-35.0k
23. Grandparents' house Method M3 The pictured terrace edge must not be treated as an approved setback.350 m²$875.0k-1.75m$8.8k-35.0k
24. Guest house Method M3 Review evacuation and service access on the limited terrace.300 m²$750.0k-1.50m$7.5k-30.0k
25. Chicken coop Method M5 Protect runoff and provide manure collection access.80 m²$20.0k-56.0k$400-2.2k
26. Chicken runs Method M5 Choose mesh and barriers for species and predator exposure.100 m²$25.0k-70.0k$500-2.8k
27. Orchard Method M6 Species and root spread must suit the terrace and services.0.5 ha$7.5k-20.0k$300-1.6k
28. Vegetable gardens Method M6 Soil depth and irrigation quality remain unknown.1400 m²$28.0k-84.0k$1.1k-6.7k
29. Greenhouse Method M6 Wind anchorage and terrace drainage need engineering.500 m²$75.0k-250.0k$1.5k-10.0k
30. Terraces and retaining systems Method M14 The 600 m2 face area is a scenario, not a measured or designed wall.600 m²$300.0k-900.0k$1.5k-13.5k
31. Courts and fountain Method M11 Keep ornamental water away from vulnerable slope drainage.1 set$10.0k-40.0k$300-2.4k
32. Cliff vegetation and grounds Method M15 Rockfall, slope stability and habitat constraints remain unresolved.2 ha$30.0k-100.0k$1.2k-8.0k

Mountain-waterfront estate: cost and operation

Construction scenario

Visible feature allowances $7.34m-16.11m

Proposed missing services $160.0k-540.0k

Priced works subtotal $7.50m-16.65m

Professional / permit allowance $899.5k-3.33m

Contingency on priced works $1.87m-6.66m

Scenario envelope, exclusions apply $10.27m-26.64m

Annual operating provision

Asset care and minor repairs $79.1k-396.1k

Staff: assumed 12 full-time equivalents $600.0k-1.08m

Utilities and operating energy $60.0k-180.0k

Renewal reserve, set aside $75.0k-333.0k

Funded annual subtotal $814.1k-1.99m

P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k

Geotechnical feasibility before the master plan

Cliff terraces, underground space and a constrained approach dominate this concept. Investigate slope stability, groundwater, rockfall and emergency access before assigning structural dimensions.

Day and night responsibilities

Open prices: Public road connection

Mountain-Waterfront Estate: Argentine Pesos

Retained scenario conversion

Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres

ARS Argentine peso