Mountain-waterfront estate: cost and operation
Construction scenario
Visible feature allowances $7.34m-16.11m
Proposed missing services $160.0k-540.0k
Priced works subtotal $7.50m-16.65m
Professional / permit allowance $899.5k-3.33m
Contingency on priced works $1.87m-6.66m
Scenario envelope, exclusions apply $10.27m-26.64m
Annual operating provision
Asset care and minor repairs $79.1k-396.1k
Staff: assumed 12 full-time equivalents $600.0k-1.08m
Utilities and operating energy $60.0k-180.0k
Renewal reserve, set aside $75.0k-333.0k
Funded annual subtotal $814.1k-1.99m
P5 Estate distribution and communications: $80.0k-240.0k P6 Fire-service water provision: $40.0k-150.0k P7 Site drainage beyond priced roads: $40.0k-150.0k
Geotechnical feasibility before the master plan
Cliff terraces, underground space and a constrained approach dominate this concept. Investigate slope stability, groundwater, rockfall and emergency access before assigning structural dimensions.
Day and night responsibilities
Open prices: Public road connection
Mountain-Waterfront Estate: Argentine Pesos
Retained scenario conversion
| Component | Build / ARS million | Care / ARS million per year |
|---|---|---|
| 1. Main gate | 30.800 to 92.400 | 0.616 to 3.696 |
| 2. Security post | 92.400 to 184.800 | 0.924 to 3.696 |
| 3. Lookout tower | 77.000 to 385.000 | 0.770 to 9.625 |
| 4. Perimeter fence | 431.200 to 1,293.600 | 2.156 to 19.404 |
| 5. Access road | 554.400 to 1,108.800 | 5.544 to 27.720 |
| 6. Public road connection | UNPRICED | UNPRICED |
| 7. Hidden shelter entrance | 539.000 to 1,386.000 | 5.390 to 41.580 |
| 8. Septic system | 30.800 to 154.000 | 0.616 to 6.160 |
| 9. Furnace | 38.500 to 154.000 | 0.770 to 6.160 |
| 10. Trash system | 15.400 to 53.900 | 0.616 to 4.312 |
| 11. Standby enclosure | 38.500 to 154.000 | 0.770 to 7.700 |
| 12. Battery storage | 147.840 to 246.400 | 1.478 to 6.160 |
| 13. Solar array | 246.400 to 431.200 | 2.464 to 8.624 |
| 14. Service area | 49.280 to 98.560 | 0.493 to 2.464 |
| 15. Food storage | 138.600 to 277.200 | 1.386 to 6.930 |
| 16. Vehicle bay | 207.900 to 415.800 | 2.079 to 10.395 |
| 17. Garage and workshop | 485.100 to 970.200 | 4.851 to 24.255 |
| 18. Well and pump house | 46.200 to 231.000 | 0.924 to 9.240 |
| 19. Water storage | 18.480 to 49.280 | 0.185 to 0.986 |
| 20. Water filtration | 30.800 to 154.000 | 1.232 to 12.320 |
| 21. Main house | 3,465.000 to 6,930.000 | 34.650 to 138.600 |
| 22. Parents' house | 1,347.500 to 2,695.000 | 13.475 to 53.900 |
| 23. Grandparents' house | 1,347.500 to 2,695.000 | 13.475 to 53.900 |
| 24. Guest house | 1,155.000 to 2,310.000 | 11.550 to 46.200 |
| 25. Chicken coop | 30.800 to 86.240 | 0.616 to 3.450 |
| 26. Chicken runs | 38.500 to 107.800 | 0.770 to 4.312 |
| 27. Orchard | 11.550 to 30.800 | 0.462 to 2.464 |
| 28. Vegetable gardens | 43.120 to 129.360 | 1.725 to 10.349 |
| 29. Greenhouse | 115.500 to 385.000 | 2.310 to 15.400 |
| 30. Terraces and retaining systems | 462.000 to 1,386.000 | 2.310 to 20.790 |
| 31. Courts and fountain | 15.400 to 61.600 | 0.462 to 3.696 |
| 32. Cliff vegetation and grounds | 46.200 to 154.000 | 1.848 to 12.320 |
BUILD ENVELOPE ARS M 15,814.006 to 41,028.064 ANNUAL FUND ARS M 1,253.676 to 3,063.322
Units and terms in this account
k (currency) thousand, 1,000 of the stated currency · USD United States dollar · m² square metre, an area unit · m (currency) million, 1,000,000 of the stated currency · ha hectare, 10,000 square metres
ARS Argentine peso