Feature, method and purposeAssumed quantityBuild USDCare/year USD
12. Horse paddock Method M5 No stocking capacity follows from the animal count in the artwork.2 ha$16.0k-40.0k$640-3.2k
13. Upper pond Method M12 Investigate source, overflow and bank stability.1 set$60.0k-250.0k$900-10.0k
14. Central pond Method M12 Keep pedestrian edges and cleaning access separate from traffic.1 set$60.0k-250.0k$900-10.0k
15. Central pavilion Method M12 Design connections for local wind and weather exposure.60 m²$60.0k-150.0k$600-4.5k
16. Pond fountains Method M11 Two units are a scenario; spray is not evidence of adequate aeration.2 set$20.0k-80.0k$600-4.8k
17. Main-house swimming pool Method M11 Provide independent circulation, treatment and barriers.1 set$60.0k-150.0k$1.8k-9.0k
18. Lower recreation pool Method M11 Include a separate pool operating and cleaning plan.1 set$60.0k-150.0k$1.8k-9.0k
19. Cascades and rock garden Method M12 This allowance covers a decorative feature, not a verified stream.1 set$60.0k-250.0k$900-10.0k
20. Greenhouse Method M6 The unlabelled glasshouse needs crop and climate specifications.300 m²$45.0k-150.0k$900-6.0k
21. Vegetable beds Method M6 Confirm soil and irrigation quality before selecting crops.1200 m²$24.0k-72.0k$960-5.8k
22. Small garden shed Method M4 Use a small tool-store assumption; actual function is unconfirmed.30 m²$27.0k-54.0k$270-1.4k
23. Solar panels Method M7 Do not infer system capacity or production from the image.30 kWdc$60.0k-105.0k$600-2.1k
24. Utility tanks and enclosure Method M8 Contents and function are unknown; 20 m3 storage is a cost scenario only.20 m3$6.0k-16.0k$60-320
Units and terms in this account

k (currency) thousand, 1,000 of the stated currency · USD United States dollar · ha hectare, 10,000 square metres · m² square metre, an area unit